{"id":3879511,"url":"https://alion.io/job/cbre-senior-electrical-engineer-data-center-construction-design","title":"Senior Electrical Engineer - Data Center Construction Design","company":{"id":1044602,"name":"CBRE","domain":"cbre.com","url":"https://alion.io/company/cbre-7","size_band":"201-500","is_staffing_agency":false,"employer_type":"direct","is_intermediary":false,"listed_via":null,"ats_vendor":"HeadHunter","truth_index":null},"role":"Operations","role_family":"Operations","seniority":"senior","employment_type":"full_time","work_mode":"remote","remote_scope":"stated_countries","remote_scope_basis":"inferred_payroll_markers","remote_working_hours":null,"hiring_geo_confidence":"inferred","locations":[],"countries":[],"hiring_countries":["US"],"hiring_countries_total":1,"salary":{"min":165000,"max":190000,"currency":"USD","period":"year","gross":null,"usd_annual":190000},"salary_estimate":null,"experience_years_min":null,"visa_sponsorship":false,"relocation_package":false,"has_equity":false,"technologies":[{"name":"Microsoft Office","optional":false},{"name":"Outlook","optional":false}],"status":"live","first_seen_at":"2026-11-06T16:47:46Z","employer_posted_date":null,"last_verified_at":"2026-11-06T16:47:46Z","board_verified":false,"closed_at":null,"days_open":2,"trust":{"level":"not_scored","repost_count":null,"flags":[],"days_open":2},"description":"Senior Electrical Engineer - Data Center Construction Design About the role\nCBRE is looking for a Senior Data Center Electrical Engineer that will assist and augment day-to-day capacity of our client’s Global Data Center - Execution Engineering (ExE) team. This shall include the design & localization of new hyperscale data centers and campuses, supporting operations staff with engineering solutions, streamlining construction issue resolution and other internal engineering tasks.This position is remote with travel as neededWhat you’ll do\n\nReview and assist development of electrical systems for hyperscale data centers including campus planning, general layout/arrangements, Single line diagrams, SCCAF, calculations, etc.\n\nReview technical development of site primary substation.\n\nReview internal specifications and vendor compliance statements (CDE).\n\nOversee design consultants and provide direction or escalation in accordance with established engineering standards.\n\nPeer review design consultants’ deliverables including drawing sets, specifications, sequence of operations, calculations, models, etc. and provide comments & resolutions\n\nReview and advise on potential value engineering opportunities.\n\nDevelop rapid conceptual sketches using CAD or BIM for visualization and spatial/dimensional validations (e.g., for conveying ideas, streamlining communication, etc.).\n\nOccasionally lead projects and solutioning of electrical issues, outages, fleet wide improvements and other needs arising from existing, operational data center campuses as ExE representative in direct support of DCOps partners.\n\nEvaluate post-mortem reports, root cause analyses and presentations and make comments and recommendations.\n\nGenerate solution/upgrade/improvement options that have a fleetwide impact to improve reliability and availability of critical operational infrastructure.\n\nReview data analytics of operational trends (historian trend logs) to evaluate equipment health, remaining useful life and predictive failure models.\n\nWork with partners in construction, design and change management to compile, prioritize/triage and process construction originated engineering issues for standard design/product improvements.\n\nWhen necessary, support engineering bulletins to ensure wide dissemination of design changes.\n\nSupport in overall standard design improvement loops/processes between products, design, construction and operations.\n\nOperate client’s “Buganizer” platform to file or close out ‘bugs’.\n\nContractor shall produce presentations using as the main ‘deliverable’ format to communicate findings, evaluations and options to internal partners\n\nWhat you’ll need\n\nBachelor's Degree preferred with 8-10 years of solid experience. In lieu of a degree, a combination of experience and education will be considered.\n\nExperience specifying switchgears/switchboards/panel boards, cables, monitoring equipment, generators, VFDs, UPS, Transformers, etc.\n\nExperience performing power system analysis with common engineering software packages.\n\nProficient user of drafting tools like CAD or BIM.\n\nExperience and general knowledge of cross discipline teams: structural, civil, IT/Telecom, security, mechanical, architectural.\n\nIn-depth knowledge of Microsoft Office or gSuite products. Examples include Word, Excel, Outlook, PowerPoint, etc.\n\nExperience with mission critical facilities design and construction is preferred.\n\nExpert interpersonal skills with an advanced inquisitive mentality.\n\nDisclaimer:\nPlease be advised that effective January 1, 2025, CBRE Project Management and Turner &Townsend were consolidated into a single global business entity. As a candidate applying for a position, you should be aware that while your initial employment may be with Tuner & Townsend PJM US LLC, you will subsequently transfer directly to Turner & Townsend at a date to be determined.Turner & Townsend carefully considers multiple factors to determine compensation, including a candidate’s education, training, and experience. The minimum salary for this position is $165,000 annually and the maximum salary for this position is $190,000 annually. The compensation that is offered to a successful candidate will depend on the candidate’s skills, qualifications, and experience. Successful candidates will also be eligible for a discretionary bonus based on Turner & Townsend’s applicable benefit program. This role will provide the following benefits: 401(K), Dental insurance, Health insurance, Life insurance, and Vision insurance.\nEqual Employment Opportunity:CBRE has a long-standing commitment to providing equal employment opportunity to all qualified applicants regardless of race, color, religion, national origin, sex, sexual orientation, gender identity, pregnancy, age, citizenship, marital status, disability, veteran status, political belief, or any other basis protected by applicable law.\n\nCandidate Accommodations: CBRE values the differences of all current and prospective employees and recognizes how every employee contributes to our company’s success. CBRE provides reasonable accommodations in job application procedures for individuals with disabilities. If you require assistance due to a disability in the application or recruitment process, please submit a request via email at or via telephone at +1 866 225 3099 (U.S.) and +1 866 388 4346 (Canada). About CBRE Group, Inc.CBRE Group, Inc. (NYSE: CBRE), a Fortune 500 and S&P 500 company headquartered in Dallas, is the world’s largest commercial real estate services and investment firm and a premier provider of critical infrastructure services. The company has more than 155,000 employees serving clients in more than 100 countries. CBRE serves clients through four business segments: Advisory (leasing, sales, debt origination, mortgage servicing, valuations); Building Operations & Experience (facilities management, property management, flex space & experience, critical infrastructure); Project Management (program management, project management, cost consulting); Real Estate Investments (investment management, development). Please visit our website at .Originally posted on Himalayas","description_format":"text","description_chars":6161,"description_truncated":false,"requirements":{"experience_years_min":null,"management_years_min":null,"team_size_min":null,"manages_managers":false,"education":null,"security_clearance":false,"languages":[]},"benefits":["Dental insurance","Health insurance","Life insurance","Vision insurance"],"hiring_locations":[{"name":"United States","iso":"US","kind":"country"}],"hiring_excludes":[],"relocation_offered":false,"industries":["Commercial Real Estate","Real Estate Brokerage","Facilities Management"],"lifecycle":[{"event":"open","at":"2026-11-06T17:28:30Z"}],"visa":[{"country":"US","licensed_sponsor":true,"adverts_offering_sponsorship_24m":0,"sanctioned_now":false,"evidence":"H-1B filings in 12 months: 132 · green card filings: 45","filings_12m":132,"filings_prev_12m":144,"green_card_filings_12m":45,"median_offered_wage_usd":126314,"route":null,"cap_exempt":false,"checked_at":"2026-11-09T07:32:21+00:00","sources":["US Department of Labor: LCA disclosure data (H-1B, H-1B1, E-3)","US Department of Labor: PERM disclosure data (green cards)"],"filings_for_role_12m":0}],"liveness":{"score":86,"band":"hot","label":"Hiring now","p_open":1,"p_active":0.86,"p_room":1,"age_days":2,"expected_fill_days":38,"reasons":["seen:2","win:early"],"computed_at":"2026-11-09T06:03:00Z"},"pay":{"stated_usd_annual":190000,"is_top_pay":true},"html_url":"https://alion.io/job/cbre-senior-electrical-engineer-data-center-construction-design","json_url":"https://alion.io/job/cbre-senior-electrical-engineer-data-center-construction-design.json","meta":{"generated_at":"2026-11-09T08:38:22Z","cache_seconds":300,"methodology":"https://alion.io/methodology","terms":"https://alion.io/terms","contact":"https://alion.io/contact","api":"https://alion.io/developers","about":"Alion is a live layer of people, companies and AI agents: who they are, whether they are real and active right now, what they do and how to work with them, readable by people and by agents and paid per call.","catalog":"https://alion.io/catalog.json","usage":{"tier":"crawler_verified","counted_by":"address","units_charged":1,"used_today":7247,"day_limit":null,"remaining_today":null,"minute_limit":300,"resets_at":"2026-11-10T00:00:00Z"}},"offers":[{"id":"company.slices","title":"One company in depth, by slice","status":"live","price":{"credits":0.1,"usd":0.01,"plus_per_slice":{"credits":0.05,"usd":0.005}},"unit":"per company, plus each slice with data","note":"the employer in depth","call":{"mcp_tool":"get_company","arguments":{"id":1044602},"rest":"https://alion.io/mcp/rest/get_company?id=1044602"},"human":"https://alion.io/catalog?offer=company.slices&for=job%2Fcbre-senior-electrical-engineer-data-center-construction-design"},{"id":"market.stats","title":"A market slice: pay, demand and time to fill","status":"live","price":{"credits":2,"usd":0.2},"unit":"per slice","note":"pay, demand and time to fill for this role and place","call":{"mcp_tool":"market_stats"},"human":"https://alion.io/catalog?offer=market.stats&for=job%2Fcbre-senior-electrical-engineer-data-center-construction-design"},{"id":"job.search","title":"Open jobs by role, technology, place, pay and visa","status":"live","price":{"credits":0.1,"usd":0.01},"unit":"per posting in a list","note":"similar open postings","call":{"mcp_tool":"search_jobs"},"human":"https://alion.io/catalog?offer=job.search&for=job%2Fcbre-senior-electrical-engineer-data-center-construction-design"},{"id":"company.verify","title":"Is this company real and active right now","status":"pilot","price":null,"unit":"per company","request":{"url":"https://alion.io/catalog/request","method":"POST","body":"{\"offer\": \"company.verify\", \"for\": \"job/cbre-senior-electrical-engineer-data-center-construction-design\", \"note\": \"what you need it for\"}"},"human":"https://alion.io/catalog?offer=company.verify&for=job%2Fcbre-senior-electrical-engineer-data-center-construction-design"}],"agent":{"mcp":"https://alion.io/mcp/jobs","mcp_open":"https://alion.io/mcp/open","next":[{"tool":"get_job","arguments":{"id":3879511}},{"tool":"search_jobs","arguments":{"company":"cbre.com","detail":"compact"}},{"tool":"match_people","arguments":{"job_id":3879511},"note":"people open to offers who fit this vacancy"}],"note":"The same data through MCP tools: https://alion.io/mcp/open needs no sign-in (compact searches, postings, people); https://alion.io/mcp with an Alion account has everything. Docs: https://alion.io/developers"}}