574,821open jobs
24,300companies
79,096added this week
Browse all
Salary
$68k per year
Location
In office (Atwater)
Employment
Contractor
Overview
Company
Impact
Profile match

Location: Atwater, CA, United States

Work environment: In-person

Expected pay: 34.00 USD Per Hour

Schedule: Full-time (usually 30+ hours/week)

Assignment length: Contract

We are helping an on-demand, autonomous ride-hailing company hire a Level 5 Vehicle Operator to test and validate the hardware and software deployed on the company’s autonomous vehicle, which will go into production in the very near future.

In this role, you’ll operate the L5 vehicle, supporting vehicle readiness, completing software and hardware tests, and, when needed, representing the company as an ambassador to the public-all while upholding the highest safety standards.

You’ll also assist and interact with multiple teams across the company, including computer vision, infrastructure, sound design, strategy, vehicle engineering, and ride operations. Working at the company will give you the opportunity to learn the Level 5 autonomous platform and how the system works as a whole. You will have a front-row seat to the operational complexities of realizing autonomous mobility while being a key component of contributing to the future of the company and the industry as a whole.

We’re looking for operators who are disciplined, are team players, and believe in doing whatever it takes to accomplish the mission. They should be motivated and driven individuals with excellent problem-solving and communication skills.

You’ll be responsible for software deployment, vehicle preparation, test execution, and troubleshooting issues before, during, and after testing. Operations will include data acquisition and annotation, ensuring test equipment readiness, and setting up the tests as directed by the test coordinator.

As a Level 5 Vehicle Operator, you will:

  • Operate and complete test missions on the L5 autonomous vehicle platform.
  • Maintain a high level of safety awareness at all times, providing input to improve processes.
  • Support the software team in the execution of key software operation tasks.
  • Support missions through a wide variety of roles, in and out of vehicles.
  • Assist with documentation and metrics capture.
  • Provide accurate written and oral feedback to engineering teams.
  • Support the Mission Readiness team with basic vehicle preventative maintenance checks, services, and repairs.
  • Provide logistical support for the movement and storage of vehicles and equipment.
  • Monitor devices during testing and troubleshoot issues.
  • Follow documented procedures and escalate to the test coordinator when issues arise.
  • Drive 4-8 hours a day with a priority for safety.

Requirements

  • Experience working with and troubleshooting complex technical systems.
  • Excellent written and verbal communication skills and attention to detail.
  • Excellent driving history and no criminal history.
  • Must have a driver's license and means of transportation to and from test sites.
  • Proactive mindset and resourcefulness.
  • Strong analytical and problem-solving skills.
  • Must be able to maintain composure and handle frequent changes or unexpected disruptions.
  • Proven track record of working with little supervision, solving problems, and meeting deadlines.

Benefits

  • Pre-tax commuter benefits
  • Employer-subsidized healthcare benefits
  • Flexible Spending Account for healthcare costs
  • All costs covered for short- and long-term disability and life insurance
  • 401k package
Free account
Stop reading job ads. Get the ones that fit.
One free account turns this page into a shortlist built around your stack, your level and your pay.
Match on every job. Stack, seniority, pay and location, scored against your profile.
574,821 open roles. Read straight off company career pages, refreshed every day.
Unlimited applications. Every one you send is tracked in one place, on-site or on a company board.
3 tailored CVs a month. Rewritten for the exact job you are applying to. Included free.
Create a free account Continue with Google
Free forever. No card. Under a minute.

Your match

How well do you fit this role?
Two answers are enough for a real match. No account needed.
Check my fit
Answers stay in this browser until you create an account.

Recommended for you based on this role

Similar stack
Same company
Atwater
$165k – $260k per year • In office • Full-Time • 10+ years exp • Bachelor's Degree • Houston • Palo Alto
Python
Go
JavaScript
Rust
TypeScript
PowerShell
C#
C++
Node JS
Rust
Tauri
C++
TensorFlow C++
PyTorch C++
AI/ML
Embeddings
Quantization
Multimodal AI
Computer Vision
AI Agents
TensorFlow
PyTorch
LLM
RAG
Edge AI
ONNX Runtime
Agentic Workflows
Frontend
Angular
React.js
DevOps
WebRTC
Azure
CI/CD
Git
Apply
$147k – $231k per year • In office • Full-Time • 4+ years exp • Bachelor's Degree • Houston • Palo Alto
Python
Go
JavaScript
Rust
TypeScript
PowerShell
C#
C++
Node JS
Rust
Tauri
C++
TensorFlow C++
PyTorch C++
AI/ML
Fine-tuning
Quantization
Multimodal AI
Knowledge Distillation
Function Calling
Computer Vision
AI Agents
Speech Recognition
TensorRT
OpenVINO
Transformers
TensorFlow
PyTorch
LLM
RAG
Hugging Face
OCR
Text-to-Speech
Human-in-the-Loop
LLM Evaluation
LLM Guardrails
Edge AI
LiteRT
ONNX Runtime
Multi-Agent Systems
Tool Use
Model Distillation
Frontend
Angular
React.js
DevOps
gRPC
GCP
WebRTC
WebSockets
Azure
CI/CD
Git
AWS
Robotics
Localization
Apply
Equity • Remote
AI/ML
Computer Vision
Physical AI
Management
Google Sheets
Marketing
HubSpot
YouTube
LinkedIn
Instagram
Apply
$114k – $265k per year (Estimated) • In office • Full-Time • 1+ year exp • Master's Degree • Sunnyvale
Python
C++
C++
TensorFlow C++
PyTorch C++
AI/ML
OpenCV
Computer Vision
TensorFlow
PyTorch
Robotics
Sensor Fusion
Apply
$14k – $31k per year (Estimated) • In office • Full-Time • Shanghai
Python
JavaScript
SQL
AI/ML
Computer Vision
IoT
MQTT
Node-RED
Apply
Assembly Technician 3 days ago
$49k – $118k per year (Estimated) • In office • San Francisco
Apply
Simulation Engineer 4 days ago
$81k – $209k per year (Estimated) • In office • Full-Time • Bachelor's Degree • New York
Python
Rust
C++
Robotics
Gazebo
Isaac Sim
MuJoCo
Apply
$127k – $257k per year (Estimated) • Remote • Full-Time
Python
TypeScript
DevOps
Docker
Apply
$72k – $187k per year (Estimated) • In office • Contractor • Fremont
Python
Java
Apply
$85k – $221k per year (Estimated) • In office • Contractor • San Francisco
DevOps
SLI/SLO/SLA
Design
SolidWorks
Fusion 360
Apply
$85k – $95k per year • In office • Full-Time • 3+ years exp • Bachelor's Degree • Atwater
Apply
$36k per year • In office • Full-Time • High School Diploma • Atwater
Apply
Loader 1st Shift 22 days ago
$40k – $48k per year • In office • Full-Time • 1+ year exp • High School Diploma • Atwater
Apply
See all jobs
This is one of many
574,821 more open roles from verified company boards, updated every day.