{"id":2391189,"url":"https://alion.io/job/fsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services","title":"Senior Electrical Engineer/Qualified Electrician - Data Center Construction - FST Technical Services","company":{"id":4419698,"name":"FST Technical Services","domain":"fsttechnical.com","url":"https://alion.io/company/fsttechnical","size_band":null,"is_staffing_agency":false,"employer_type":"direct","is_intermediary":false,"listed_via":null,"ats_vendor":"JazzHR","truth_index":null},"role":"Operations","role_family":"Operations","seniority":"senior","employment_type":null,"work_mode":"on_site","remote_scope":null,"remote_scope_basis":null,"remote_working_hours":null,"hiring_geo_confidence":"explicit","locations":["Ann Arbor, United States"],"countries":["US"],"hiring_countries":[],"hiring_countries_total":0,"salary":{"min":120000,"max":170000,"currency":"USD","period":"year","gross":null,"usd_annual":170000},"salary_estimate":null,"experience_years_min":5,"visa_sponsorship":true,"relocation_package":false,"has_equity":false,"technologies":[{"name":"Microsoft Office","optional":false}],"status":"live","first_seen_at":"2026-10-12T21:16:11Z","employer_posted_date":"2026-10-12","last_verified_at":"2026-10-26T05:05:01Z","board_verified":true,"closed_at":null,"days_open":13,"trust":{"level":"ok","repost_count":null,"flags":[],"days_open":13},"description":"FST Technical Services’ Commissioning (Cx) Division is a leading provider of quality assurance in the design, construction, and post-acceptance phases of building projects. The Senior Electrical Commissioning Engineer reports to a team leader and is responsible for the delivery and execution of our commissioning services for complex electrical systems supporting large scale data center projects.\nPrimary activities include completing office assignments, time and expense management, in-field installation validation, field observation reports and meeting notes, functional performance testing, on-site and factory witness testing, writing of reports and meeting notes, submittal reviews, and design documentation evaluation.\nAdditional activities include executing target billable hours, managing tasks within time budgeted, leading Cx meetings, assisting the construction team with identifying/solving technical issues when they arise, and interpreting contract documents to predict scope gaps, maximize opportunities to provide value for clients, and reduce risk.\nAdministrative activities include supporting the team leader in coordinating weekly staff scheduling, training/mentoring team members on proper documentation, field procedures, and equipment usage, participating in and leading sessions of the company-wide developmental safety and training programs, and supporting revenue targets and quality assurance goals by expanding relationships with existing clients.\nCandidate must be able to travel to and from various job sites within the assigned region.\nRequirements:\nQualified Electrician or Degree in Electrical Engineering\n 7+ years employment in a staff or intern position related to maintenance, construction, or engineering controls or 3+ years in the commissioning industry\nPrevious experience within the data center industry \n5+ years of experience managing the interconnectivity of building equipment including pumps, fans, motors, air ventilation, chillers, boilers, steam distribution, heat absorption, building automation systems, optimization techniques, electrical distribution, fire alarm, variable refrigerant flow, and waste-water systems.\nKnowledge of construction drawings, specifications, bid process, and ancillary industry documents\nAptitude to solve problems independently and in a team environment\n Effective verbal and written communication skills\n Public speaking and presentation skills\n Adaptability to varying indoor and outdoor working conditions\n Physical fitness, capability to lift at least 30 pounds, and ability to climb ladders\n Proficiency in Microsoft Office\n Preferred Qualifications:Trade association involvement\nEIT, ACP. CEM or similar certification from experience\nLEED or CEM certification preferred\nOSHA 30 or other safe workplace certifications\nFamiliarity with building information modeling\nFST Technical does not offer employment-based visa sponsorship for this position. Applicants must be legally authorized to work in the United States without the need for employer sponsorship now or in the future.\nSalary Range: $120,000-$170,000 - based on experience","description_format":"text","description_chars":3119,"description_truncated":false,"requirements":{"experience_years_min":5,"management_years_min":5,"team_size_min":null,"manages_managers":false,"education":null,"security_clearance":false,"languages":[]},"benefits":[],"hiring_locations":[{"name":"United States","iso":"US","kind":"country"}],"hiring_excludes":[],"relocation_offered":false,"industries":[],"lifecycle":[{"event":"open","at":"2026-10-12T21:16:11Z"}],"visa":[],"liveness":{"score":30,"band":"fade","label":"Fading","p_open":1,"p_active":0.664,"p_room":0.45,"age_days":13,"expected_fill_days":8,"reasons":["conf:0","win:tail"],"computed_at":"2026-10-26T05:57:25Z"},"pay":{"stated_usd_annual":170000,"is_top_pay":true},"html_url":"https://alion.io/job/fsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services","json_url":"https://alion.io/job/fsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services.json","meta":{"generated_at":"2026-10-26T07:23:37Z","cache_seconds":300,"methodology":"https://alion.io/methodology","terms":"https://alion.io/terms","contact":"https://alion.io/contact","api":"https://alion.io/developers","about":"Alion is a live layer of people, companies and AI agents: who they are, whether they are real and active right now, what they do and how to work with them, readable by people and by agents and paid per call.","catalog":"https://alion.io/catalog.json","usage":{"tier":"crawler_verified","counted_by":"address","units_charged":1,"used_today":9855,"day_limit":null,"remaining_today":null,"minute_limit":300,"resets_at":"2026-10-27T00:00:00Z"}},"offers":[{"id":"company.slices","title":"One company in depth, by slice","status":"live","price":{"credits":0.02,"usd":0.002,"plus_per_slice":{"credits":0.05,"usd":0.005}},"unit":"per company, plus each slice with data","note":"the employer in depth","call":{"mcp_tool":"get_company","arguments":{"id":4419698},"rest":"https://alion.io/mcp/rest/get_company?id=4419698"},"human":"https://alion.io/catalog?offer=company.slices&for=job%2Ffsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services"},{"id":"market.stats","title":"A market slice: pay, demand and time to fill","status":"live","price":{"credits":1,"usd":0.1},"unit":"per slice","note":"pay, demand and time to fill for this role and place","call":{"mcp_tool":"market_stats"},"human":"https://alion.io/catalog?offer=market.stats&for=job%2Ffsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services"},{"id":"job.search","title":"Open jobs by role, technology, place, pay and visa","status":"live","price":{"credits":0.02,"usd":0.002},"unit":"per posting in a list","note":"similar open postings","call":{"mcp_tool":"search_jobs"},"human":"https://alion.io/catalog?offer=job.search&for=job%2Ffsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services"},{"id":"company.verify","title":"Is this company real and active right now","status":"pilot","price":null,"unit":"per company","request":{"url":"https://alion.io/catalog/request","method":"POST","body":"{\"offer\": \"company.verify\", \"for\": \"job/fsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services\", \"note\": \"what you need it for\"}"},"human":"https://alion.io/catalog?offer=company.verify&for=job%2Ffsttechnical-senior-electrical-engineerqualified-electrician-data-center-construction-fst-technical-services"}]}