{"id":1409550,"url":"https://alion.io/job/oracle-sr-manager-data-center-construction-management-2","title":"Sr. Manager, Data Center Construction Management","company":{"id":53,"name":"Oracle","domain":"oracle.com","url":"https://alion.io/company/oracle","size_band":"5000+","is_staffing_agency":false,"employer_type":"direct","is_intermediary":false,"listed_via":null,"ats_vendor":"Oracle","truth_index":{"grade":"A","score":93,"open_postings":227,"ghost_share":0,"stale_share":0.476,"repost_share":0.009,"time_to_fill_p50_days":5,"computed_at":"2026-10-14T06:34:16Z"}},"role":"Operations","role_family":"Operations","seniority":"lead","employment_type":null,"work_mode":"on_site","remote_scope":null,"remote_scope_basis":null,"remote_working_hours":null,"hiring_geo_confidence":"structured","locations":["Abilene, United States"],"countries":["US"],"hiring_countries":[],"hiring_countries_total":0,"salary":{"min":126200,"max":264100,"currency":"USD","period":"year","gross":null,"usd_annual":264100},"salary_estimate":null,"experience_years_min":10,"visa_sponsorship":false,"relocation_package":false,"has_equity":true,"technologies":[{"name":"Power BI","optional":true},{"name":"Smartsheet","optional":true},{"name":"Tableau","optional":true}],"status":"live","first_seen_at":"2026-09-28T15:43:39Z","employer_posted_date":"2026-09-28","last_verified_at":"2026-10-15T00:59:31Z","board_verified":true,"closed_at":null,"days_open":16,"trust":{"level":"ok","repost_count":null,"flags":[],"days_open":16},"description":"ABOUT THE ROLE:\nSenior Manager, Construction Management\nOracle Cloud Infrastructure (OCI) - Data Center Infrastructure\nOrganization: OCI Hyperscale Data Center Delivery\nLocation: Shackelford, Texas\nOracle Cloud Infrastructure (OCI) is seeking a Senior Manager, Construction Management to lead field execution for hyperscale data center construction in Shackelford, Texas.\nThis role is responsible for driving safe, predictable, high-quality construction delivery across assigned buildings, systems, areas, or discipline scopes. The Senior Manager will build of a team of direct reports and coordinate contractors, track field progress, resolve execution issues, reinforce safety and quality expectations, and support turnover readiness for commissioning and startup.\nThis is a highly field-based leadership role requiring strong site presence approximately 85-95% field/site engagement, direct contractor engagement, and hands-on execution management. The role serves as a senior field leader and escalation point, helping ensure daily construction activities align with project sequencing, milestone commitments, and OCI delivery standards.\nThis role is based in Shackelford, Texas (20 miles from Oracle Cloud Infrastructure Abilene AI Data Center). This role does not offer remote flexibility. We are interested in candidates who are local or open to relocating to the Abilene area. Oracle offers relocation packages for eligible candidates.\n Lead daily construction execution for assigned buildings, systems, areas, or trade scopes. \nCoordinate general contractors, subcontractors, foremen, superintendents, and trade partners. \nMonitor field progress, manpower, productivity, sequencing, and workface readiness. \nEnsure construction activities align with approved schedules, milestones, logistics plans, and turnover priorities. \nIdentify and resolve field issues, trade conflicts, congestion risks, and execution constraints. \nEscalate unresolved risks quickly and clearly to construction leadership. \nReinforce onsite safety expectations through visible field leadership. \nSupport installation quality verification and help reduce rework. \nPartner with QA/QC, commissioning, controls, logistics, safety, and operations teams. \nTrack punch-list items, turnover readiness, and startup support requirements. \nProvide accurate daily field reports, progress updates, issue logs, and milestone updates. \nSupport recovery plans when schedule, quality, productivity, or coordination issues arise. \nCoach and support Construction Managers to promote consistent field execution practices. \nMaintain continuous site awareness through regular field walks and direct contractor engagement. \nQualifications:\n10+ years' experience in managing construction execution on large-scale, complex projects.\n\n2+ years' experience in a leadership role with direct reports\n\nExperience in data centers, mission-critical facilities, industrial construction, infrastructure, semiconductor, power, or other technical construction environments.\n\nStrong knowledge of construction sequencing, field coordination, manpower tracking, productivity monitoring, and milestone execution. \nDemonstrated ability to coordinate contractors, subcontractors, trade partners, inspectors, and owner-side stakeholders. \nAbility to read and interpret construction drawings, specifications, schedules, look-ahead plans, and turnover documentation. \nProven ability to identify field risks, resolve construction issues, and escalate effectively. \nStrong understanding of safety expectations, quality standards, punch-list management, and turnover readiness. \nExcellent communication skills with the ability to provide clear, accurate, and timely field updates. \nAbility to work primarily onsite with approximately 85-95% field/site engagement. \nStrong ownership mindset, urgency, and ability to operate in a fast-paced construction environment. \nPreferred Qualifications:\nExperience delivering hyperscale data centers or cloud infrastructure projects. \nExperience in an owner’s representative, construction management, EPC, or general contractor environment. \nFamiliarity with data center systems, including electrical, mechanical, controls, civil, structural, architectural, network, or commissioning-related scopes. \nExperience leading or coaching Construction Managers, field engineers, coordinators, or discipline-specific construction teams. \nExperience supporting fast-track construction, phased turnover, commissioning-driven delivery, or recovery execution. \nFamiliarity with construction reporting tools, scheduling platforms, document control systems, and issue tracking processes (e.g., Primavera P6, Oracle Primavera Cloud, MS Project, Power BI, Tableau, Smartsheet, or similar tools)\nStrong ability to drive contractor accountability while maintaining productive working relationships. \nAbility to lead through field presence, direct communication, disciplined follow-up, and practical problem solving. \nCertifications: PMP, PgMP, PMI-SP, CCP, PSP, Lean Six Sigma\nTop of Form\nDisclaimer:Certain U.S. based or U.S. customer or client-facing roles may be required to comply with applicable requirements, such as immunization/occupational health mandates, and/or drug testing requirements.\nRange and benefit information provided in this posting are specific to the stated locations only\nUS: Hiring Range in USD from: $126,200 to $264,100 per annum. May be eligible for bonus, equity, and compensation deferral.\nOracle maintains broad salary ranges for its roles in order to account for variations in knowledge, skills, experience, market conditions and locations, as well as reflect Oracle's differing products, industries and lines of business.\nCandidates are typically placed into the range based on the preceding factors as well as internal peer equity.\nOracle US offers a comprehensive benefits package which includes the following:\n1. Medical, dental, and vision insurance, including expert medical opinion\n2. Short term disability and long term disability\n3. Life insurance and AD&D\n4. Supplemental life insurance (Employee/Spouse/Child)\n5. Health care and dependent care Flexible Spending Accounts\n6. Pre-tax commuter and parking benefits\n7. 401(k) Savings and Investment Plan with company match\n8. Paid time off: Flexible Vacation is provided to all eligible employees assigned to a salaried (non-overtime eligible) position. Accrued Vacation is provided to all other employees eligible for vacation benefits. For employees working at least 35 hours per week, the vacation accrual rate is 13 days annually for the first three years of employment and 18 days annually for subsequent years of employment. Vacation accrual is prorated for employees working between 20 and 34 hours per week. Employees working fewer than 20 hours per week are not eligible for vacation.\n9. 11 paid holidays\n10. Paid sick leave: 72 hours of paid sick leave upon date of hire. Refreshes each calendar year. Unused balance will carry over each year up to a maximum cap of 112 hours.\n11. Paid parental leave\n12. Adoption assistance\n13. Employee Stock Purchase Plan\n14. Financial planning and group legal\n15. Voluntary benefits including auto, homeowner and pet insurance\nThe role will generally accept applications for at least three calendar days from the posting date or as long as the job remains posted.\nAs part of Oracle's onboarding process and consistent with applicable law, US-based employees are required to complete identity verification, which involves the collection and processing of their biometric information. Accommodations to this requirement may be granted following an individualized assessment.","description_format":"text","description_chars":7664,"description_truncated":false,"requirements":{"experience_years_min":10,"management_years_min":null,"team_size_min":null,"manages_managers":false,"education":null,"security_clearance":false,"languages":[]},"benefits":["Equity","Life insurance","Parental leave","Vision insurance"],"hiring_locations":[],"hiring_excludes":[],"relocation_offered":true,"industries":["Construction","CRM Software","ERP & Business Management Software","HR & Payroll Software"],"lifecycle":[{"event":"open","at":"2026-09-28T18:52:34Z"}],"visa":[{"country":"US","licensed_sponsor":true,"evidence":"H-1B filings in 12 months: 1,038 · green card filings: 729","filings_12m":1038,"filings_prev_12m":1197,"green_card_filings_12m":729,"median_offered_wage_usd":143374,"route":null,"cap_exempt":false,"checked_at":"2026-10-03T21:08:04+00:00","sources":["US Department of Labor: LCA disclosure data (H-1B, H-1B1, E-3)","US Department of Labor: PERM disclosure data (green cards)"],"filings_for_role_12m":0}],"liveness":{"score":19,"band":"cold","label":"Long shot","p_open":1,"p_active":0.538,"p_room":0.35,"age_days":15,"expected_fill_days":5,"reasons":["conf:0","velocity","win:tail","comp:brand"],"computed_at":"2026-10-14T06:34:16Z"},"pay":{"stated_usd_annual":264100,"is_top_pay":true},"html_url":"https://alion.io/job/oracle-sr-manager-data-center-construction-management-2","json_url":"https://alion.io/job/oracle-sr-manager-data-center-construction-management-2.json","meta":{"generated_at":"2026-10-15T01:30:40Z","cache_seconds":300,"methodology":"https://alion.io/methodology","terms":"https://alion.io/terms","contact":"https://alion.io/contact","api":"https://alion.io/developers","about":"Alion is a live layer of people, companies and AI agents: who they are, whether they are real and active right now, what they do and how to work with them, readable by people and by agents and paid per call.","catalog":"https://alion.io/catalog.json","usage":{"tier":"crawler_verified","counted_by":"address","units_charged":1,"used_today":2043,"day_limit":null,"remaining_today":null,"minute_limit":300,"resets_at":"2026-10-16T00:00:00Z"}},"offers":[{"id":"company.slices","title":"One company in depth, by slice","status":"live","price":{"credits":0.02,"usd":0.002,"plus_per_slice":{"credits":0.05,"usd":0.005}},"unit":"per company, plus each slice with data","note":"the employer in depth","call":{"mcp_tool":"get_company","arguments":{"id":53},"rest":"https://alion.io/mcp/rest/get_company?id=53"},"human":"https://alion.io/catalog?offer=company.slices&for=job%2Foracle-sr-manager-data-center-construction-management-2"},{"id":"market.stats","title":"A market slice: pay, demand and time to fill","status":"live","price":{"credits":1,"usd":0.1},"unit":"per slice","note":"pay, demand and time to fill for this role and place","call":{"mcp_tool":"market_stats"},"human":"https://alion.io/catalog?offer=market.stats&for=job%2Foracle-sr-manager-data-center-construction-management-2"},{"id":"job.search","title":"Open jobs by role, technology, place, pay and visa","status":"live","price":{"credits":0.02,"usd":0.002},"unit":"per posting in a list","note":"similar open postings","call":{"mcp_tool":"search_jobs"},"human":"https://alion.io/catalog?offer=job.search&for=job%2Foracle-sr-manager-data-center-construction-management-2"},{"id":"company.verify","title":"Is this company real and active right now","status":"pilot","price":null,"unit":"per company","request":{"url":"https://alion.io/catalog/request","method":"POST","body":"{\"offer\": \"company.verify\", \"for\": \"job/oracle-sr-manager-data-center-construction-management-2\", \"note\": \"what you need it for\"}"},"human":"https://alion.io/catalog?offer=company.verify&for=job%2Foracle-sr-manager-data-center-construction-management-2"}]}