Overview
Connections
News
Salaries
Products
People
Growth
Offices
Jobs
Financials

Overview

Power the future of cloud and AI. Hanwha Data Centers delivers renewable energy and infrastructure to fuel hyperscale growth.

News

Blog 7 months ago
Enterprise Energy Campus Strategy: What CIOs Need to Know
Key Takeaways Power constraints have replaced compute as the primary bottleneck for AI deployment, making an enterprise energy campus strategy essential to any serious infrastructure investment. McKinsey projects global data center capacity demand could r
Read more
Report
Blog 7 months ago
Data Center Time to Power: How Campuses Speed AI Deployment
Key Takeaways Energy campuses are compressing data center time to power from years to a fraction of traditional timelines, giving early movers a decisive edge in the AI infrastructure race. Grid interconnection queues now stretch five to seven years in ma
Read more
Report
Blog 7 months ago
Microgrids for Data Centers: The Energy Campus Advantage
Key Takeaways Campus-scale microgrids are becoming essential infrastructure for data center operators who need energy reliability and scalable power without years-long grid delays. Grid interconnection queues now average five years from request to operati
Read more
Report
Blog 7 months ago
Redundant Data Center Power for AI: Why It's Non-Negotiable
Key Takeaways Redundant data center power has shifted from a best practice to a baseline requirement as AI workloads demand continuous, high-density energy delivery with zero tolerance for interruption. Power remains the leading cause of serious data cent
Read more
Report
Blog 7 months ago
The Data Center Power Chain: From Grid to Rack
Key Takeaways The data center power chain is the single biggest factor determining whether AI infrastructure gets built on time or stalls in a years-long queue. U.S. data center grid power demand is projected to nearly triple by 2030, reaching over 134 GW
Read more
Report
Blog 7 months ago
Colocated Substations for Data Centers: Benefits, Risks & Strategy
Key Takeaways Colocated substations are becoming a critical strategy for data center operators looking to bypass grid bottlenecks and secure reliable, high-capacity power. On-site substation infrastructure can dramatically reduce the time to energized cap
Read more
Report
Blog 7 months ago
How AI Is Reshaping Data Center Energy Infrastructure
Key Takeaways AI compute demand is forcing a fundamental rethinking of how data center energy infrastructure gets built, sourced, and delivered. Grid interconnection bottlenecks are pushing operators toward on-site generation, energy storage, and hybrid p
Read more
Report
Blog 7 months ago
AI-Ready Infrastructure: A CTO's Power Planning Guide
Key Takeaways Power availability has replaced location as the primary constraint for AI-ready infrastructure, with 72% of industry executives calling grid capacity their top challenge. AI data center power demand could grow more than thirtyfold by 2035, m
Read more
Report
Blog 8 months ago
Energy Constrained Data Centers: Build Your Campus
Key Takeaways: Grid interconnect delays and limited power availability have become the primary bottleneck for data center expansion, with some utilities quoting connection timelines of 10+ years. Sites facing power constraints require strategic selection
Read more
Report
Blog 8 months ago
AI Energy Strategy for Hyperscale Operators: What to Get Right
Key Takeaways Power availability now determines AI deployment timelines more than any other factor. Global data center electricity consumption is projected to double to 945 TWh by 2030, with AI workloads accounting for nearly half of all net new demand In
Read more
Report
Show more news

Salary insights

Compensation ranges based on this company's open jobs
Median
$180k
Typical range
$145k – $235k
Open positions
5
5 Jobs
Senior 60%
Staff 20%
Architect 20%
Level Jobs Median Typical range
Senior 3 $180k $145k – $200k
Staff 1 $160k $160k
Architect 1 $235k $235k
Highest paying role Director, Data Center Development $235k
Normalized to USD per year
All salaries at Hanwha Data Centers By role, level and city, against the market · 5 jobs with pay

Growth

Hiring Momentum
66/100
Growing
Open positions
5
3 opened / 1 closed in 30 days
Median time-to-fill
187 days
faster than 6% of the market
ATS activity
Every ~4 hours
Today
Hiring Dynamics +100%
Hiring Focus
The percentage next to each role is its share of the company's job openings over the last 90 days; the arrow shows the shift versus the previous period.
Sales
40% ▲
Leadership
20% ▲
Marketing
20% ▼
Industrial Engineering
20% ▲
Activity Timeline
+3 jobs in a week Oct 2026

Offices

Where the company hires and what each office is for
Cities
13
Hiring now
0
Countries
1
Loading the map
Headquarters Builds here Office with open vacancies No open vacancies right now Tap a pin for the office
Irvine United States
HQ
Our US Headquarters
400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618
company site, careers board
Washington United States
Regional office
Washington DC
careers board
Houston United States
Regional office
Houston, TX or Austin, TX
careers board
Cleveland United States
Regional office
Cleveland, OH
careers board
Austin United States
Regional office
Austin, TX
careers board
Fort Collins United States
Regional office
Fort Collins, CO
careers board
Boulder City United States
Regional office
Boulder City, NV
careers board
Beachwood United States
Regional office
Beachwood, OH
careers board
Round Rock United States
Regional office
Round Rock, TX
careers board
Odessa United States
Regional office
Odessa, TX
careers board
Georgetown United States
Regional office
Georgetown, TX
careers board
Lufkin United States
Regional office
Lufkin, TX
careers board
Angleton United States
Regional office
Angleton, TX
careers board

Jobs

$215k – $235k per year · Remote (likely United States) · 7+ years exp · Bachelor's Degree
Apply