CES clean energy solutions

Engineering Services

Overview

About Us CES HOME 5 About Us Complex projects and tasks demand integrative solutions based on a broad spectrum of experience. This conviction has systematically characterised our method of working.

Salary insights

Compensation ranges based on this company's open jobs
Median
$59k
Typical range
$34k – $72k
Open positions
5
2 Jobs
Middle 50%
Senior 50%
Level Jobs Median Typical range
Middle 1 $51k $51k
Senior 1 $72k $72k
Highest paying role Projektleiter - Tragwerksplanung (m/w/d) $72k
Normalized to USD per year
All salaries at CES clean energy solutions By role, level and city, against the market · 5 jobs with pay

Growth

Hiring Momentum
28/100
Slowing
Open positions
6
0 opened / 0 closed in 30 days
ATS activity
Every ~4 hours
Today
Hiring Focus
The percentage next to each role is its share of the company's job openings over the last 90 days; the arrow shows the shift versus the previous period.
Management
50% ▲
Industrial Engineering
33% ▲
Field & Service
17% ▲
Actively hiring for Management (+3 in 30 days)

Tech stack

Technologies named in job postings at CES clean energy solutions over the last 12 months, by layer, with the share of postings for each.
Technologies in use
4
Postings analysed
1
Stack modernity
74/100
Languages
C#
Python
Databases
MS SQL
Cloud & platforms
.NET
Sign in to see how your skills match this stack Sign In

News

Blog 4 years ago
Biology Campus University of Vienna, Asbestos and Mineral Fiber Deposits: Survey and Specialized Site Supervision
In course of implementing a safety and fire protection system in the Biology Campus Building of the University of Vienna (UZA 1 Biozentrum), maximum protection for users, persons and the environment was achieved. Since the work was performed during ongoin
Read more
Report
Blog 4 years ago
Solvay Bulgaria: Full Survey and Risk Evaluation of Asbestos Containing Materials
Verification of existing ACM deposits by visual inspections, to setup a multi-variable deposit database, to advise on appropriate remediation technology, related cost estimate, as well as technical and economical prioritization of disposal actions.The Sod
Read more
Report
Blog 4 years ago
Former Dormitory, Ploesslgasse 2, 1040 Vienna: Construction Site Waste Scheme and Pollutant Survey
The aim was to conduct a qualitative and quantitative determination of waste streams in the course of demolition of the building and underground constructions and installations. The construction site waste scheme was implemented according to Vienna waste
Read more
Report
Blog 4 years ago
District Cooling for Hospital Mödling and EVN Corporate Headquarter: Process Design
As one part is a joint district heating and cooling system heat can be sold during summer time. The district colling pipe enables the operator to decide, which process shall deliver the cooling power.EVN installed two cooling facilities, which then were c
Read more
Report
Blog 4 years ago
Implementation of Sustainable Energy Finance Facilities in Ukraine (USEFF) - Project Consultant
The objective was to instigate a self-sustaining market for investment in sustainable energy projects in Ukrainian private sector companies. In order to achieve this objective, the Consultant worked closely with local Banks and selected local engineers to
Read more
Report
Blog 4 years ago
Biomass prefeasibility studies for 15 DH companies in Serbia
The project aimed at facilitating the development of a market for biomass and supporting the sustainable use of biomass in the generation of heat and electricity in Serbia. In terms of capital investments, the Serbian government and KfW envisaged the cons
Read more
Report
Blog 4 years ago
SHPP Bistrica Montenegro, Design and Approval Planning
Approval planning for Bemax d.o.o. for the 4 MW small hydro power plant Bistrica to obtain official permits required for the execution and the operation of the plant.The Bistrica SHPP scheme is located on the river Bistrica, close to the town Berane, in t
Read more
Report
Blog 4 years ago
Don Bosco Haus, Vienna: Sustainable Refurbishment Concept
Achieving energy potential savings, optimization of the costs of the life-cycle, and preparation of a sustainable reclamation concept.For the Don Bosco Haus in 1130 Vienna, St. Veit-Gasse 25, a renovation concept was developed in correspondence with the c
Read more
Report
Blog 4 years ago
Municipal Hospital Rudolfstiftung, Pathological Department, Air Sampling after Asbestos Removal Works.
Quality Monitoring of Asbestos Removal Works according to Austrian Standard ÖNORM M 9406.On the Eastern facade on level 0 and -1 of the Hospital's main building, window sills and the facade itself were cleaned from sprayed asbestos and sedimented asbestos
Read more
Report

Offices

Where the company hires and what each office is for
Cities
3
Hiring now
3
Countries
2
Busiest office
Vienna
Loading the map
Headquarters Builds here Office with open vacancies Tap a pin for the office
Vienna Austria
HQ
Contacts
4 open roles 4 posted in 90 days $54k Avg Salary
hires for Management, Field & Service
Schönbrunner Straße 297 1120 Vienna, Austria
seen since Oct 2026 company site, job postings
Tirana Albania
1 open roles 1 posted in 90 days
hires for Industrial Engineering
seen since Oct 2026 job postings
Salzburg Austria
1 open roles 1 posted in 90 days $60k Avg Salary
hires for Industrial Engineering
seen since Nov 2026 job postings