Confirmed on the employer's own hiring board on Nov 18, 2026. First seen by Alion on Nov 18, 2026. Eneco scores B on the Alion truth index.
At Eneco we work towards one clear goal: being fully climate-neutral by 2035. To get there, renewable energy has to be steered quickly and reliably. A wind park has to ramp down when the grid asks for it, and a battery has to charge when power is cheap and green.
SCADA (the systems that monitor and control these assets remotely) makes that possible. You keep those systems secure, stable and ready for growth, which means your work directly decides how much renewable energy we can use.
You do this in a team that shares knowledge openly, learns from every incident and gives you room to bring in your own ideas.
- You design, build and maintain SCADA solutions for energy production, storage and flexibility assets.
- You build and improve integrations with AGC (Automatic Generation Control, which adjusts our output to grid signals), EMS and DERMS platforms, battery storage systems, RTUs and field devices.
- You connect SCADA to trading platforms, asset management systems, OT environments and data platforms.
- You lead troubleshooting when an interface or system doesn't behave as expected, and find the root cause.
- You review designs, assess new technology and guide vendors through implementations, upgrades and migrations.
- You join the on-call rotation and help keep our operations running, day and night.
- High availability, performance and security of our SCADA platforms.
- Fewer operational incidents, through structural fixes and clear root cause analysis.
- Successful integration of new assets and interfaces into the SCADA landscape.
- Engineering standards, design guidelines and operational best practices that the team actually uses.
- Clear monitoring, alerting and observability, so issues are spotted before they become problems.
- Compliance with OT security standards and Eneco's security policies, including support during audits and risk assessments.
- You have a bachelor's or master's degree in Electrical Engineering, Energy Systems, Industrial Automation, Computer Science or a similar field.
- You have around 7 years or more of SCADA engineering experience, ideally in energy, utilities, grid operations or industrial automation.
- You have worked on large SCADA implementations and integrations, and you know what it takes to run mission-critical systems.
- You know your way around HMI systems, RTUs, PLCs and telemetry, and you're comfortable with protocols like IEC 60870-5-104, IEC 61850, OPC UA/DA, Modbus and MQTT.
- You understand Windows Server, Linux, networking and high-availability setups. Experience with cloud or hybrid environments, REST APIs and messaging platforms is a plus.
- You stay calm during incidents, explain technical choices clearly to non-technical colleagues and enjoy helping others grow.
- You're familiar with working in Agile, ITIL or DevOps environments.
- Recognise yourself in most of this, but not every requirement? We'd still love to hear from you.
You join a team of SCADA engineers working closely with OT specialists, product teams, operations and trading. You act as the technical authority for SCADA, but you never work alone: you take decisions together, share what you learn and coach less experienced colleagues.
You also work with external suppliers and grid operators, so no two weeks look the same.
You are the go-to expert for the SCADA platforms that monitor and control Eneco's wind, solar, battery and flexibility assets.
You link SCADA to grid operators, trading platforms and energy management systems, so our assets respond in real time.
You set the technical direction, coach other engineers and shape how the SCADA landscape grows.

