1,877,033open jobs
110,266companies
256,173added this week
Browse all
Salary
$130k – $180k per year
Location
In office (Los Angeles)
Seniority
Senior

Confirmed on the employer's own hiring board on Oct 20, 2026. First seen by Alion on Oct 12, 2026.

Overview
Company
Impact
Profile match
FST Technical Services is an American provider of testing, inspection, certification and compliance services based in Chandler, Arizona, covering QA/QC, commissioning and onsite technical teams for mission-critical facilities. Founded in 1984 to serve the semiconductor and life sciences industries, it now also works on data centers, healthcare facilities and automotive and battery plants from satellite offices across the US, and has acquired Validation Systems Incorporated. It hires commissioning field and project engineers, construction project managers and coordinators, process engineers and document control specialists.

Lead the Systems That Power Critical Infrastructure

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.

We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.

Why This Role Stands Out

This is not a checklist-driven commissioning role.

This is a position for someone who:

  • Owns outcomes, not just tasks
  • Understands systems holistically, not in silos
  • Can operate independently while leading others

You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.

What You’ll Do

Project Leadership & Execution

  • Lead commissioning activities across the full project lifecycle
  • Execute and oversee functional testing, factory witness testing, and on-site validation
  • Manage multiple assignments while maintaining schedule, budget, and quality expectations
  • Interpret contract documents to identify risks and opportunities

Technical Expertise & Problem Solving

  • Evaluate electrical distribution systems and building system interconnectivity
  • Troubleshoot system performance issues in real time
  • Review design documentation and submittals

Client & Stakeholder Engagement

  • Lead commissioning meetings and communicate findings
  • Serve as a trusted partner to clients and contractors

Operational Contributions

  • Complete field reports, documentation, and time management
  • Support scheduling and revenue targets

Team Development

  • Mentor junior engineers and support training initiatives

What You Bring

Core Qualifications

  • Electrical Engineering degree or Qualified Electrician background
  • 7+ years in electrical systems OR 3+ years commissioning
  • Data center or mission-critical experience

Technical Capabilities

  • Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation
  • Ability to read construction drawings and specifications

Professional Skills

  • Strong analytical and communication skills
  • Ability to lead meetings and manage multiple priorities

Physical Requirements

  • Ability to work in field environments, climb ladders, and lift ~30 lbs

Preferred

  • EIT, CEM, LEED, OSHA 30, BIM experience

Travel Requirements

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required.

Why FST

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles

Salary range: $130,000 to $180,000

Free account
Stop reading job ads. Get the ones that fit.
One free account turns this page into a shortlist built around your stack, your level and your pay.
Match on every job. Stack, seniority, pay and location, scored against your profile.
1,877,033 open roles. Read straight off company career pages, refreshed every day.
Unlimited applications. Every one you send is tracked in one place, on-site or on a company board.
3 tailored CVs a month. Rewritten for the exact job you are applying to. Included free.
Create a free account Continue with Google
Free forever. No card. Under a minute.

Recommended for you based on this role

Operations
Similar stack
Same company
Los Angeles
Chief of Staff 1 hour ago
$165k – $200k per year • Equity • Hybrid • Full-Time • 5+ years exp • Washington
Apply
≈ $62k – $123k per year (Estimated) • Equity • In office • Full-Time • 5+ years exp • Bachelor's Degree • Birmingham • Atlanta • Charlotte
Analytics
Microsoft Excel
Apply
$62k – $126k per year • Equity • In office • 5+ years exp • Washington
Apply
$62k – $126k per year • Equity • In office • 5+ years exp • Richmond
Apply
$62k – $126k per year • Equity • In office • 5+ years exp • Springfield
Apply
≈ $42k – $87k per year (Estimated) • In office • 2+ years exp • High School Diploma • Durham
Management
Outlook
Microsoft Office
Apply
$130k – $150k per year • In office • 7+ years exp • Chicago
Apply
$120k – $170k per year • In office • 5+ years exp • Ann Arbor
Management
Microsoft Office
Apply
Apply
$130k – $180k per year • In office • Irvine
Apply
Hybrid • Full-Time • Los Angeles
Analytics
Microsoft Excel
Apply
$65k – $75k per year • In office • Los Angeles
Apply
$38k – $42k per year • In office • Los Angeles
Apply
$58k – $64k per year • In office • Contractor • Los Angeles
Management
Slack
Apply
$200k – $400k per year • Remote (United States) • 3+ years exp • Master's Degree • Los Angeles
AI/ML
RLHF
Prompt Engineering
Machine Learning
Apply
See all jobs
This is one of many
1,877,033 more open roles from verified company boards, updated every day.