1,831,769open jobs
105,451companies
269,709added this week
Browse all
Salary
$120k – $170k per year
Location
In office (Ann Arbor)
Seniority
Senior · 5+ years exp
Visa
No sponsorship (stated in the posting)

Confirmed on the employer's own hiring board on Oct 18, 2026. First seen by Alion on Oct 12, 2026.

Overview
Company
Impact
Profile match
FST Technical Services is an American provider of testing, inspection, certification and compliance services based in Chandler, Arizona, covering QA/QC, commissioning and onsite technical teams for mission-critical facilities. Founded in 1984 to serve the semiconductor and life sciences industries, it now also works on data centers, healthcare facilities and automotive and battery plants from satellite offices across the US, and has acquired Validation Systems Incorporated. It hires commissioning field and project engineers, construction project managers and coordinators, process engineers and document control specialists.

FST Technical Services’ Commissioning (Cx) Division is a leading provider of quality assurance in the design, construction, and post-acceptance phases of building projects. The Senior Electrical Commissioning Engineer reports to a team leader and is responsible for the delivery and execution of our commissioning services for complex electrical systems supporting large scale data center projects.

Primary activities include completing office assignments, time and expense management, in-field installation validation, field observation reports and meeting notes, functional performance testing, on-site and factory witness testing, writing of reports and meeting notes, submittal reviews, and design documentation evaluation.

Additional activities include executing target billable hours, managing tasks within time budgeted, leading Cx meetings, assisting the construction team with identifying/solving technical issues when they arise, and interpreting contract documents to predict scope gaps, maximize opportunities to provide value for clients, and reduce risk.

Administrative activities include supporting the team leader in coordinating weekly staff scheduling, training/mentoring team members on proper documentation, field procedures, and equipment usage, participating in and leading sessions of the company-wide developmental safety and training programs, and supporting revenue targets and quality assurance goals by expanding relationships with existing clients.

Candidate must be able to travel to and from various job sites within the assigned region.

Requirements:

  • Qualified Electrician or Degree in Electrical Engineering
  • 7+ years employment in a staff or intern position related to maintenance, construction, or engineering controls or 3+ years in the commissioning industry
  • Previous experience within the data center industry
  • 5+ years of experience managing the interconnectivity of building equipment including pumps, fans, motors, air ventilation, chillers, boilers, steam distribution, heat absorption, building automation systems, optimization techniques, electrical distribution, fire alarm, variable refrigerant flow, and waste-water systems.
  • Knowledge of construction drawings, specifications, bid process, and ancillary industry documents
  • Aptitude to solve problems independently and in a team environment
  • Effective verbal and written communication skills
  • Public speaking and presentation skills
  • Adaptability to varying indoor and outdoor working conditions
  • Physical fitness, capability to lift at least 30 pounds, and ability to climb ladders
  • Proficiency in Microsoft Office
Preferred Qualifications:
  • Trade association involvement
  • EIT, ACP. CEM or similar certification from experience
  • LEED or CEM certification preferred
  • OSHA 30 or other safe workplace certifications
  • Familiarity with building information modeling

FST Technical does not offer employment-based visa sponsorship for this position. Applicants must be legally authorized to work in the United States without the need for employer sponsorship now or in the future.

Salary Range: $120,000-$170,000 - based on experience

Free account
Stop reading job ads. Get the ones that fit.
One free account turns this page into a shortlist built around your stack, your level and your pay.
Match on every job. Stack, seniority, pay and location, scored against your profile.
1,831,769 open roles. Read straight off company career pages, refreshed every day.
Unlimited applications. Every one you send is tracked in one place, on-site or on a company board.
3 tailored CVs a month. Rewritten for the exact job you are applying to. Included free.
Create a free account Continue with Google
Free forever. No card. Under a minute.

Your match

How well do you fit this role?
Two answers are enough for a real match. No account needed.
Check my fit
Answers stay in this browser until you create an account.

Recommended for you based on this role

Operations
Similar stack
Same company
Ann Arbor
Facilities Engineer 1 hour ago
$150k – $180k per year • In office • 12+ years exp • Bachelor's Degree • Santa Clara
Apply
≈ $87k – $170k per year (Estimated) • In office • 5+ years exp • High School Diploma • Research Triangle Park
Cybersecurity
CAPA
Apply
Procurement Manager 1 hour ago
≈ $88k – $174k per year (Estimated) • In office • 7+ years exp • Bachelor's Degree • North Kingstown
Apply
≈ $53k – $104k per year (Estimated) • In office • 3+ years exp • High School Diploma • Greenwood
Management
Microsoft Office
Apply
≈ $78k – $152k per year (Estimated) • In office • 5+ years exp • PhD • Mesa
Apply
≈ $50k – $100k per year (Estimated) • In office • Full-Time • 5+ years exp • Toledo
Management
Microsoft Office
Apply
≈ $39k – $73k per year (Estimated) • In office • Full-Time • 4+ years exp • High School Diploma • Cincinnati • Atlanta • Saint Paul
Management
Microsoft Office
Apply
In office • Full-Time • Mettingen
Management
Microsoft Office
Apply
$127k – $174k per year • Remote (United States) • Full-Time • Bachelor's Degree • United States
Cybersecurity
GDPR
Management
Microsoft Office
Apply
$68k – $94k per year • Hybrid • Full-Time • Bachelor's Degree • United States
Cybersecurity
GDPR
Management
Power Apps
Microsoft Office
Apply
≈ $41k – $86k per year (Estimated) • In office • 2+ years exp • High School Diploma • Durham
Management
Outlook
Microsoft Office
Apply
$130k – $150k per year • In office • 7+ years exp • Chicago
Apply
Apply
$130k – $180k per year • In office • Los Angeles
Apply
$130k – $180k per year • In office • Irvine
Apply
≈ $45k – $94k per year (Estimated) • Equity • In office • Part-Time • 2+ years exp • Ann Arbor
Apply
≈ $75k – $153k per year (Estimated) • In office • Full-Time • 1+ year exp • Ann Arbor
Apply
≈ $39k – $87k per year (Estimated) • In office • Ann Arbor
Apply
≈ $53k – $122k per year (Estimated) • In office • Full-Time • Ann Arbor
Apply
≈ $27k – $47k per year (Estimated) • In office • Full-Time • 2+ years exp • Ann Arbor
Apply
See all jobs
This is one of many
1,831,769 more open roles from verified company boards, updated every day.