Confirmed on the employer's own hiring board on Nov 16, 2026. First seen by Alion on Nov 16, 2026. SEGULA Technologies scores A on the Alion truth index.
line-height:normal">We are seeking an experienced TIA Portal
& AGV Commissioning (IBN) Expert to lead software programming,
functional integration, and field commissioning for Automated Guided Vehicle
(AGV / eAGV) systems.
line-height:normal">In addition to deep technical expertise in
Siemens TIA Portal and AGV communication standards (VDA 5050 / LIF),
this role requires a strong Software / Functional Coordinator who can
bridge the gap between mechanical, electrical, software, and IT trades. You
will bring a high-energy delivery-focused mindset, driving system
finishing, punchlist closure, and successful customer handovers on tight plant
schedules.
line-height:normal;mso-outline-level:3">Key
Responsibilities
line-height:normal;mso-outline-level:4"> 1. Siemens TIA Portal & AGV Integration
line-height:normal;mso-list:l2 level1 lfo1;tab-stops:list 36.0pt">Design,
program, test, and optimize PLC software using Siemens TIA Portal (S7-1500
/ S7-1200, Safety Integrated, WinCC).
line-height:normal;mso-list:l2 level1 lfo1;tab-stops:list 36.0pt">Integrate
and validate AGV fleet communications and upper-level interfaces using VDA
5050 and LIF (Logistics Interface Format) over MQTT, OPC UA,
JSON, or REST protocols.
line-height:normal;mso-list:l2 level1 lfo1;tab-stops:list 36.0pt">Program
safety logic, emergency stop matrixes, and protective field switching in
compliance with ISO 13849 / IEC 62061 standards.
line-height:normal;mso-list:l2 level1 lfo1;tab-stops:list 36.0pt">Conduct
virtual commissioning (PLCSIM Advanced, SIMIT) prior to site deployment to
streamline physical on-site startup (IBN).
line-height:normal;mso-outline-level:4"> 2. Software & Functional Coordination
line-height:normal;mso-list:l1 level1 lfo2;tab-stops:list 36.0pt">Act as
the functional owner for electric AGV (eAGV) automation workflows,
ensuring smooth handshakes between onboard vehicle controls, plant PLCs,
and Fleet Management Systems (FMS).
line-height:normal;mso-list:l1 level1 lfo2;tab-stops:list 36.0pt">Define
protocol standards, signal maps, and operational sequences across software
modules and IT boundaries.
line-height:normal;mso-list:l1 level1 lfo2;tab-stops:list 36.0pt">Validate
complex end-to-end logistics functions, including charging station
triggers, transfer station docks, dynamic route allocations, and safety
zone switching.
line-height:normal;mso-outline-level:4"> 3. Cross-Trade Coordination
line-height:normal;mso-list:l3 level1 lfo3;tab-stops:list 36.0pt">Serve
as the primary technical coordinator across mechanical, electrical,
software, and IT teams during installation and startup.
line-height:normal;mso-list:l3 level1 lfo3;tab-stops:list 36.0pt">Interface
directly with external sub-suppliers (conveyor systems, high-bay
warehouses, automated doors, robotic cell controllers, and safety
fencing).
line-height:normal;mso-list:l3 level1 lfo3;tab-stops:list 36.0pt">Lead
regular cross-trade alignment sessions to resolve spatial conflicts,
signal mismatches, and timing dependencies before they block project
milestones.
line-height:normal;mso-outline-level:4"> 4. Execution & Punchlist Delivery
line-height:normal;mso-list:l0 level1 lfo4;tab-stops:list 36.0pt">Drive
final system completion through Factory Acceptance Testing (FAT), Site
Acceptance Testing (SAT), and formal customer sign-off.
line-height:normal;mso-list:l0 level1 lfo4;tab-stops:list 36.0pt">Rigorously
track, manage, and close out project punchlists (Mängellisten)
under active production launch conditions.
line-height:normal;mso-list:l0 level1 lfo4;tab-stops:list 36.0pt">Perform
root-cause analysis on intermittent glitches, edge-case operational
faults, and latency issues to achieve target system availability (KPI
compliance).
line-height:normal;mso-list:l0 level1 lfo4;tab-stops:list 36.0pt">Provide
operational documentation, handover protocols, and hands-on training to
plant maintenance teams.

