Open

System integrator for HES facility at Aalborg University

Aalborg Universitet Denmark EU Tenders Electronic Daily
Who can bidFirms from the EU and EEA; above the EU thresholds also from WTO GPA countries
Deadline
Dec 18 2026
21 d left
Published
Nov 27 2026
Category
Services
CPV 51100000
Procedure
Open procedure

Description

The tender concerns an Agreement for System Integrator for Hybrid Energy Storage (HES) project. Aalborg University - AAU Energy is set to create a new hybrid Energy Storage (HES) facility representing a pioneering advancement in scalable, controllable, modular, and flexible energy storage solutions. This cutting-edge facility addresses critical challenges in grid stability, power quality management, and future renewable energy integration while providing essential grid balancing services. The HES facility integrates storage technologies, including Supercapacitors and Battery modules, coupled with Power Electronic interfaces, a Real-Time Digital Simulator, and a Linear Power Amplifier. Operating at a 750-kW capacity level, the facility is designed to: • Stabilize power demand fluctuations from renewable energy sources • Enable both grid-connected and islanded operational modes • Support energy services and power system-level applications

Parties

Earlier contracts of this buyer: who won and for how much

Source: EU Tenders Electronic Daily · licence: EU reuse (Decision 2011/833) · https://ted.europa.eu