| 2026-11-13 | Austrian Power Grid AG | Austria | Abrufbestellung HSU 220kV | $14.3M |
| 2026-10-23 | Hydria | Belgium | Entretien et réparations de centrifugeuses ANDRITZ | $811k |
| 2026-09-29 | ČEZ Distribuce, a. s. | Czech Republic | Dodávky ŘS, ochran a HMI | $564k |
| 2026-09-01 | Internal Revenue Service | United States | EXTENDSIM SOFTWARE MAINTENANCE RENEWAL | $7k |
| 2026-07-22 | EDF SA | France | Saut Mortier -Marché Pompe Turbine - Lot Electromécanique | $11.7M |
| 2026-07-22 | EDF SA | France | Saut Mortier -Marché Pompe Turbine - Lot Electromécanique | $11.7M |
| 2026-05-26 | Bureau of Reclamation | United States | EO 14398 N8 AIR ADMISSION SUPPORT CONE | $65k |
| 2026-05-21 | Technische Universität Bergakademie Freiberg | Germany | hydraulische Schmiedepresse | $1.3M |
| 2026-04-07 | Siaep de la Région de Condom-Caussens (Service d'Assainissement Collectif) | France | DEGRILLEUR ENTREE STEP CONDOM-BOURG | $60k |
| 2026-03-30 | Syndicat Interdepartemental pour L Assainissement de L Agglomération Parisienne | France | Travaux de refonte des sécheurs B et C Andritz de l’usine de Valenton | $5.9M |
| 2026-03-30 | Syndicat Interdepartemental pour L Assainissement de L Agglomération Parisienne | France | Travaux de refonte des sécheurs B et C Andritz de l’usine de Valenton | $5.9M |
| 2026-03-20 | DB Energie GmbH (Bukr 31) | Germany | Retrofit Umformer E2 Hamburg-Harburg | not stated |
| 2026-03-04 | Saint-Nazaire Agglomération - la Carene | France | MAINTENANCE PREVENTIVE ET CURATIVE DES DECANTEUSES ANDRITZ | $132k |
| 2026-03-03 | Saint-Nazaire Agglomération - la Carene | France | Maintenance préventive et curative des décanteuses Andritz | $132k |
| 2026-03-03 | Saint-Nazaire Agglomération - la Carene | France | Maintenance préventive et curative des décanteuses Andritz | $132k |
| 2026-01-16 | DB Energie GmbH (Bukr 31) | Germany | Synchronisierung Maschinenschutz im Umformer Hamburg-Harburg | $952k |
| 2025-12-19 | DB Energie GmbH (Bukr 31) | Germany | Rahmenverträge 16,7 Hz Netzschutztechnik | not stated |
| 2025-11-18 | Klärschlammverwertung Buchenhofen GmbH | Germany | Neubau KVA Buchenhofen - Los 3: Verfahrens- und EMSR-Technik | not stated |
| 2025-09-08 | SIDEN SIAN et ses Régies Noréade | France | Accord-cadre mono-attributaire à bons de commande et à marchés subséquents pour la fourniture et la maintenance de décanteuses centrifugeuses et presses à boues Andritz | $2.3M |
| 2025-09-02 | DB Energie GmbH (Bukr 31) | Germany | Ertüchtigung der Maschinenleittechnik Los 1 u. Systemleittechnik Los 2 | not stated |
| 2025-08-29 | JAVNO PODJETJE ENERGETIKA LJUBLJANA d.o.o. | Slovenia | ENLJ-SPV-117/25 - Zamenjava pregrevalnika 2 in 3 v kotlu 3 po sklopih | $1.6M |
| 2025-08-04 | RBB Vermögensgesellschaft mbH & Co. KG | Germany | Errichtung einer Klärschlammverwertungsanlage (KSVA) in Böblingen „Ausschreibungspaket“ ASP01: Verfahrens- und EMSR-Technik | not stated |
| 2025-07-29 | ÖBB-Infrastruktur AG | Austria | (ProVia-ID 122208) Rahmenvertrag für Multifunktionsschutzgeräte | $802k |
| 2025-07-09 | ÖBB-Infrastruktur AG | Austria | (ProVia-ID 105818) KW Fulpmes Sammelschienenschutzerneuerung; Lieferung und Inbetriebnahme SS-Schutz | $109k |
| 2025-07-07 | DRAVSKE ELEKTRARNE MARIBOR d.o.o. | Slovenia | Dobava in montaža turbine, generatorja in SN opreme - LOT TG za projekt Rekonstrukcija HE Formin in jezu Markovci | $81.5M |
| 2025-06-30 | DB Energie GmbH (Bukr 31) | Germany | Spannungsregelung Erregung DCX Synchronmaschine Umformer E2 und option E1 | not stated |
| 2025-05-26 | ÖBB-Infrastruktur AG | Austria | (ProVia-ID 122328) Rahmenvertrag für die Erstellung eines Umspanner Schutzgeräte | $937k |
| 2025-04-23 | Bureau of Reclamation | United States | MTE PUMP GENERATING MANUFACTURING AND REHABILITATION MULTIPLE AWARD IDIQ | not stated |
| 2025-04-09 | I/S Amager Ressourcecenter | Denmark | Service og reservedele til el-filter inkl. SIR-enheder på ARCs affaldsenergianlæg | $2.1M |
| 2025-03-10 | ČEZ, a. s. | Czech Republic | EŠT - migrace ŘS TG2 | $819k |
| 2025-02-25 | ČEZ, a. s. | Czech Republic | EDA, EMO - Upgrade ŘS | $838k |
| 2024-12-19 | Engadiner Kraftwerke AG Muglinè 29 CH-7530 Zernez | Switzerland | Zentrale Ova Spin Revision und Erneuerung Pumpturbinen | $7.9M |
| 2024-09-06 | Bureau of Reclamation | United States | BUSHINGS FOR KA3A KA5A GSU TRANSFORMERS | $465k |
| 2024-09-04 | Bureau of Reclamation | United States | HOOVER DAM GENERATING UNIT A5 RE-WEDGE | $1.2M |
| 2024-07-24 | Stadt Wien - Wien Kanal | Austria | 22., Erweiterung Regenwasser-Pumpwerk LDS | $3.2M |
| 2024-07-18 | SBB AG Einkauf Infrastruktur Elektroanlagen und Energie ‘’Projekt Kraftwerk Wassen, MG1 – Umbau 2026, Los WV 5.2 KW-Leittechnik – NICHT OEFFNEN''. | Switzerland | Kraftwerk Wassen, MG1 – Umbau 2026, Los WV 5.2 KW- Leittechnik | $2M |
| 2024-07-03 | ÖBB-Infrastruktur AG | Austria | (ProVia-ID 99539) KW Eb Erneuerung Maschinenschutz M1-M4; Maschinenschutz KW Enzingerboden | $549k |
| 2024-06-18 | Bureau of Reclamation | United States | MT-CF POWERPLANT GENERATOR TASK ORDER 3 | $1.9M |
| 2024-06-07 | Intercommunale de Développement Economique et d'Aménagement du Coeur du Hainaut | Belgium | Accord-cadre - Entretien des décanteuses | $441k |
| 2024-06-05 | MHB Hamm Betriebsführungsgesellschaft mbH | Germany | Erneuerung RGR (vormals: Neubau Kapazitätserhaltungslinie - VP3) der MVA Hamm | not stated |
| 2024-05-30 | MVA Bielefeld-Herford GmbH | Germany | MVA Bielefeld-Herford GmbH: Leistungen für die Verbrennung, Dampferzeugung, Rauchgasreinigung und pneumatische Förderung (Los 1) für die Errichtung einer Monoklärschlammverbrennungsanlage | not stated |
| 2024-04-30 | Syndicat Mixte de Gestion de l'Eau et de l'Assainissement de la Guadeloupe (971) | France | REHABILITATION DE L'UNITE DE PRODUCTION D'EAU POTABLE DE DESVARIEUX AU MOULE - TRAVAUX D'URGENCE | $528k |
| 2024-04-19 | UAB Ignitis grupės paslaugų centras (PV) | Lithuania | Upgrade of the control systems of the KHAE and KHE, as well as the installation of the automatic generation control system and maintenance services | $3.4M |
| 2024-02-23 | Department of the Army | United States | REPAIR OF CP-6003 MASTER CONTROL UNIT | $20k |
| 2024-01-22 | ČEZ, a. s. | Czech Republic | Modernizace buzení EDA TG1, TG2, TG3, TG4 a EMO TG5 | $1.4M |
| 2023-12-07 | Elektrizitätswerk der Stadt Zürich (ewz) Finanzen und Controlling Projekteinkauf, FEP | Switzerland | Tiefencastel West, Revision Maschinengruppe 1 und 2 | $3.4M |
| 2023-11-22 | Vattenfall Wasserkraft GmbH | Germany | Ersatz der Erregereinrichtung des Pumpspeichersatzes (PSS) "F" (optional: PSS E,G,H) im PSW Hohenwarte 2 | $855k |
| 2023-11-14 | Water Services Corporation | Malta | WSC/T/69/2023 - SUPPLIES – NEGOTIATED PROCEDURE FOR THE SUPPLY AND DELIVERY OF SPARE PARTS FOR ANDRITZ SLUDGE DEWATERING CENTRIFUGES – WATER SERVICES CORPORATION | $583k |
| 2023-11-05 | Bureau of Reclamation | United States | DAVIS D3 GENERATOR THRUST BEARING SPRINGS | $67k |
| 2023-11-03 | SBB AG Infrastruktur Energie ''Projekt RV Schutzgeräte 16,7 Hz - NICHT OEFFNEN'' | Switzerland | RV Schutzgeräte 16,7 Hz | $1M |
| 2023-09-19 | Bureau of Reclamation | United States | LOWER PARADOX GATE REFURBISHMENT | $1.6M |
| 2023-09-12 | Bureau of Reclamation | United States | CONSTRUCTION AND DELIVERY OF DRAFT TUBE BULKHEAD | $920k |
| 2023-08-24 | Bureau of Reclamation | United States | MT - CF PP GENERATOR DELIVERY ORDER 3 | $1.7M |
| 2023-07-13 | Bureau of Reclamation | United States | N3 CURRENT TRANSFORMER REFURBISHMENT TASK ORDER, ISSUED UNDER TURBINE AND GENERATOR HYDROELECTRIC COMPONENT MANUFACTURING AND REHABILITATION IDIQ. | $106k |
| 2023-06-12 | Bureau of Reclamation | United States | ANDERSON RANCH DAM TURBINE MODERNIZATION AND RUNNER REPLACEMENT. | $16.6M |
| 2023-03-27 | Bureau of Reclamation | United States | PACKING GLANDS | $41k |
| 2023-02-02 | Department of the Army | United States | REHABILITATION OF OLD HICKORY TURBINE GENERATORS | $91.7M |
| 2022-12-07 | Bureau of Reclamation | United States | TASK ORDER - INSTALLATION AND FIELD TESTING OF THE GENERATOR STATOR CORE AND ARMATURE WINDING | $1.9M |
| 2022-12-05 | Bureau of Reclamation | United States | CF POWERPLANT GENERATOR DELIVERY ORDER 2 | $1.6M |
| 2022-09-22 | Bureau of Reclamation | United States | PARADOX GATE REFURBISHMENT | $1.2M |
| 2022-07-26 | Department of the Army | United States | HIPASE EXCITER LIFE EXTENSION KIT | $576k |
| 2022-04-29 | Bureau of Reclamation | United States | TURBINE GUIDE BEARING REFURBISHMENT UNITS N1-4 | $113k |
| 2021-09-30 | Department of the Army | United States | UNITS 1-2 GENERATOR STATOR REWIND, BEAVER POWERHOUSE. COMPLETION DUE 705 CALENDAR DAYS AFTER NTP. | $20.2M |
| 2021-09-23 | Department of the Army | United States | RS KERR TURBINE & GENERATOR REHABILITATION | $92.2M |
| 2021-09-14 | Bureau of Reclamation | United States | FURNISH VARIOUS COMPONENTS UNDER IDIQ 140R6021D0003 | $2.3M |
| 2021-09-14 | Bureau of Reclamation | United States | MT-CF POWERPLANT GENERATOR 1 TASK ORDER | $2.3M |
| 2021-08-13 | Internal Revenue Service | United States | EXTEND RENEWAL | $35k |
| 2021-07-27 | Bureau of Reclamation | United States | CANYON FERRY POWERPLANT GENERATOR REWIND REFURBISHMENT - IDIQ | not stated |
| 2021-05-25 | Bureau of Reclamation | United States | A9 TURBINE OVERHAUL | $2.7M |
| 2021-04-21 | Department of the Army | United States | KEYSTONE POWER PLANT GENERATOR REWIND | $13.6M |
| 2021-04-07 | Department of the Army | United States | MNA SERVICE STATION UNITS UPGRADE | $15.2M |
| 2020-09-29 | Department of the Army | United States | BARKLEY POWER PLANT TURBINE GENERATOR REHABILITATION FOR UNITS 1-4. | $80.4M |
| 2020-09-21 | Bureau of Reclamation | United States | MT. ELBERT REHABILITATION, UNIT #1&UNIT #2 SHAFT SEAL REPLACEMENTS | $1.4M |
| 2019-04-18 | ČEZ Distribuce, a. s. | Czech Republic | Dodávky ŘS, ochran a HMI | $2.1M |
| 2019-04-18 | ČEZ Distribuce, a. s. | Czech Republic | Dodávky ŘS, ochran a HMI | $1.1M |
| 2019-04-12 | Bureau of Reclamation | United States | GRAND COULEE JOHN W. KEYS III PUMP-GENERATING PLANT EXCITATION SYSTEM, GOVERNOR, AND PROTECTIVE RELAY REPLACEMENT AND CONTROLS MODERNIZATION, COLUMBIA BASIN PROJECT, WASHINGTON | $34.6M |
| 2018-06-07 | OSHC Barqi Tojik | Tajikistan | Rehabilitation of five generating units of Nurek HPP | not stated |
| 2018-06-07 | OSHC Barqi Tojik | Tajikistan | Rehabilitation of five generating units of Nurek HPP | not stated |
| 2018-03-15 | Department of the Army | United States | EXCITATION SYSTEM | $2.7M |
| 2016-06-17 | Department of the Army | United States | JOHN DAY BLH TURBINE HUB UPGRADES | $24.4M |
| 2011-05-06 | Bureau of Reclamation | United States | G22, G23, AND G24 OVERHAUL, GRAND COULEE DAM, THIRD POWERPLANT, WASHINGTON. TOTAL AMOUNT OF PROJECT: $101,971,541.00. | $149.2M |
| 2010-12-27 | Department of the Army | United States | FUNDING IS FOR HYDRAULIC TURBINE MODEL FABRICATION. AWARD IS FOR THE PURCHASE OF TWO TURBINE RUNNERS INCLUDING TWO UNIT REWINDS AT HILLS CREEK DAM IN OREGON. | $17.6M |
| 2010-12-10 | Department of the Army | United States | THE REQUIRED W ORK IS TO PROVIDE MATERIALS, EQUIPMENT AND SERVICES TO REW IND THE GENERATORS OF UNITS 1, 2, AND 3 AT WEBBERS FALLS POWERPLANT. THIS WORK INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING: 1) DESIGN, MANUFACTURE, SHOP TEST, AND DELIVER THREE COMPLETE SET OF STATOR COILS 2) DISASSEMBLE TH | $6.1M |
| 2005-05-03 | Department of the Army | United States | 200508!500781!96CE!W9127S!USA ENGINEER DIST LITTLE ROCK !W9127S05C0013 !A!N! !N! ! !20050503!20120930!807792031!300989654!301716494!N!VA TECH VOEST MCE CORP !10715 DAVID TAYLOR DR !CHARLOTTE !NC!28262!00000! !AU!* !* !AUSTRIA !+000001500000!N!N!000117330595!2830!WATER TURBINES&WATER WHEELS&COMPS !C9 | $108.8M |
| AFFINITY WATER LIMITED | United Kingdom | UVDB Powered by Achilles QUDM for Goods, Works and Services | not stated |