| 2026-09-02 | Department of State | United States | AE NATURAL HAZARDS TASK ORDER FOR THE NOB PEER REVIEW AT DILI, TIMOR-LESTE | $32k |
| 2026-08-19 | Department of State | United States | MASS TIMBER AND CROSS LAMINATED TIMBER | $158k |
| 2023-09-21 | Department of State | Egypt | DE/CSE ASSISTANCE WITH CONDUCTING RAPID VISUAL SCREENINGS OF BUILDINGS WITHIN THE ACTIVE BUILDING PORTFOLIOS OF NINE POSTS: BRATISLAVA, CAIRO, CHISINAU, GUADALAJARA, LISBON, SANTO DOMINGO, VIENNA, NEW DELHI, AND SHENYANG. | $1.4M |
| 2023-09-20 | Department of State | Colombia | DE/CSE WITH ASSISTANCE IN DEVELOPING A NON-STRUCTURAL BRACING GUIDE TO BETTER PROVIDE DETAILS AND GUIDANCE TO POSTS FOR SAFELY SECURING NON-STRUCTURAL COMPONENTS (AT ALL BUILDING TYPES, OWNED/LEASED, HOUSING/OFFICE, ETC. COMMONLY FOUND IN POST PORTFO | $149k |
| 2022-09-21 | Department of State | United States | CSR WITH SERVICES TO CONDUCT ON-SITE SEISMIC SCREENING EVALUATIONS OF SELECTED BUILDINGS AT A SELECTED NUMBER OF POST LOCATIONS. THE SCREENINGS CONDUCTED WILL PROVIDE SEISMIC VULNERABILITY DATA OF THE STRUCTURES TO BE USED IN CS R S RISK MITIGATION M | $861k |
| 2022-07-14 | U.S. Fish and Wildlife Service | United States | A/E PHASE 2 CONSTRUCTION MANAGEMENT SERVICES FOR KLAMATH FALLS SUCKER FISH HATCHERY | $245k |
| 2022-07-05 | U.S. Fish and Wildlife Service | United States | WA-RIDGEFIELD NWR-ANALYSIS OF EXISTING W | $86k |
| 2022-06-14 | U.S. Fish and Wildlife Service | United States | WA LYONS FERRY MARMES CONSTRUCTION ADMIN | $49k |
| 2022-05-18 | U.S. Fish and Wildlife Service | United States | OR-KLAMATH FALLS NFH BOUNDARY SURVEY LEASED - SACRAMENTO VALLEY ZONE | $27k |
| 2022-04-06 | U.S. Fish and Wildlife Service | United States | WATER DELIVERY SYSTEM UPGRADE FOR CAMAS NWR | $33k |
| 2021-09-14 | U.S. Fish and Wildlife Service | United States | CREEK RESTORATION DESIGN AT CAMAS NWR | $310k |
| 2021-08-26 | Department of State | Pakistan | TASK ORDER FOR SEISMIC DEFICIENCIES IN THE DCMR LOCATED IN ISLAMABAD, PAKISTAN. CONFIRM PREVIOUS FINDINGS THAT THE BUILDING IS SEISMICALLY DEFICIENT AND DEVELOP A CONCEPTUAL SEISMIC STRENGTHENING SCHEME. | $166k |
| 2021-08-23 | U.S. Fish and Wildlife Service | United States | HI-HANALEI NWR INTAKE CM SERVICES | $97k |
| 2021-08-10 | U.S. Fish and Wildlife Service | United States | WA-TOPPENISH NWR-A&E GAMBLE CRK CM SVCS | $30k |
| 2021-06-02 | U.S. Fish and Wildlife Service | United States | ID CAMAS NWR SECTION 106 CULTURAL RESO | $22k |
| 2021-05-10 | U.S. Fish and Wildlife Service | United States | OR-BASKETT SLOUGH NWR DUSKY MARSH CM SVC | $43k |
| 2021-02-18 | U.S. Fish and Wildlife Service | United States | WA-LYONS FERRY MARMES MCC BUILDING | $148k |
| 2020-09-30 | Department of State | United States | WORLDWIDE SEISMIC AND NATURAL HAZARDOUS. | not stated |
| 2020-09-23 | U.S. Fish and Wildlife Service | United States | AK ARCTIC NWR FAIRBANKS MULTI-PURPOSE BLDG | $228k |
| 2020-09-21 | U.S. Fish and Wildlife Service | United States | OR-DIV OF ENGINEERING-A&E SVCS PUMP STAT | $188k |
| 2020-09-15 | U.S. Fish and Wildlife Service | United States | OR-KLAMATH FALLS FWO SUCKER FISH DESIGN | $521k |
| 2020-05-04 | U.S. Fish and Wildlife Service | United States | OR-KLAMATH FALLS FWO DESIGN PHASE 1 | $683k |
| 2020-04-29 | U.S. Fish and Wildlife Service | United States | KOOSKIA NFH BIOFILTER MEDIA STRUCTURE | $97k |
| 2020-02-11 | U.S. Fish and Wildlife Service | United States | HI-HANALEI NWR INTAKE NEPA DOCUMENTATION | $284k |
| 2019-12-19 | U.S. Fish and Wildlife Service | United States | ID-KOOSKIA NFH INTAKE FEASIBILITY STUDY | $189k |
| 2019-08-03 | U.S. Fish and Wildlife Service | United States | WA-ABERNATHY FTC REPAIR INTAKE A/E SVCS | $395k |
| 2019-07-03 | U.S. Fish and Wildlife Service | United States | OR-WARM SPRINGS NFH INTAKE PERMIT - GEOTECH ENGINEERING ASSESSEMENT OF SITE | $161k |
| 2019-06-17 | U.S. Fish and Wildlife Service | United States | US FWS WESTERN REGIONS AE IDIQ MATOC | not stated |
| 2019-03-08 | U.S. Fish and Wildlife Service | United States | CA-R8 REALTY-BOUNDARY SURVEY TRACT 11 | $18k |
| 2018-09-11 | U.S. Fish and Wildlife Service | United States | ; OR-WARM SPRINGS NFH INTAKE RE-DESIGN | $190k |
| 2018-08-01 | U.S. Fish and Wildlife Service | United States | TITLE: A-E DESIGN SERVICES TO REPAIR/REPLACE ASPHALT PAVING AT LYONS FERRY FISH HATCHERY, STARBUCK WA | $163k |
| 2017-08-28 | U.S. Fish and Wildlife Service | United States | TITLE: OR-LOOKINGGLASS FH INTAKE FISH PASS NEPA | $163k |
| 2017-08-28 | U.S. Fish and Wildlife Service | United States | ; IDIQ CONTRACT FOR LAND SURVEYS SACRAMENTO VALLEY ZONE | not stated |
| 2015-09-19 | Department of State | Armenia | THIS TASK ORDER PROVIDES FUNDING FOR MULTI POST SEISMIC SURVEYS/ASSESSMENTS OVER THE NEXT TWO YEARS. | $958k |
| 2014-03-27 | Department of State | United States | THE PURPOSE OF THIS TASK ORDER IS TO RE-ESTABLISH FUNDS IN THE TASK ORDER FOR MAN-HOUR ENGINEERING SUPPORT SERVICES. | $47k |