| 2026-11-12 | Federal Aviation Administration | United States | ETVS TED TOUCHSCREEN PROTOTYPES | $113k |
| 2026-11-06 | National Aeronautics and Space Administration | United States | CLPS 2.0 | not stated |
| 2026-09-30 | Maritime Administration | United States | USMMA TRAINING VESSLE SERVICE FOR KPER | $16k |
| 2026-09-23 | Federal Aviation Administration | United States | BASE YEAR FUNDING FOR AC-26-04889 REPAIR CONTRACT. FOR SUPPORT OF ETVS/STVS IN ACCORDANCE WITH THE STATEMENT OF WORK. ENHANCED TERMINAL VOICE SWITCH / SMALL TOWER VOICE SWITCH SYSTEMS | $2.5M |
| 2026-09-22 | Federal Aviation Administration | United States | ETVS-STVS CONTRACTOR REPAIR SERVICE CONTRACT | not stated |
| 2026-07-22 | Defense Logistics Agency | United States | CB STATOR SLEEVE | $444k |
| 2026-07-22 | Defense Logistics Agency | United States | 8512255140!CANOPY,MOVABLE | $1.1k |
| 2026-07-22 | Defense Logistics Agency | United States | 8512255141!FIREWALL,FUSELAGE | $750 |
| 2026-07-22 | Defense Logistics Agency | United States | 8512255086!EXTENSION,LEFT HAND | $150 |
| 2026-07-16 | Defense Logistics Agency | United States | 8512241683!BUSHING,SLEEVE | $72k |
| 2026-07-16 | Defense Logistics Agency | United States | 8512245038!COUPLING,TUBE | $900 |
| 2026-07-08 | Department of the Navy | United States | STEM SUBASSEMBLY | $1M |
| 2026-06-08 | Department of the Air Force | United States | HIGH POWER LASER ILLUMINATOR TECHNOLOGY ENHANCEMENT (HOPLITE) | $1M |
| 2026-05-28 | Department of the Navy | United States | PROGRAM MANAGER, EXPEDITIONARY RADARS (PM EXR) HAS A REQUIREMENT FOR THE G/ATOR INFRASTRUCTURE SUPPORT TO M67854-26-F-0013 OFF THE SUSTAINMENT ENGINEERING AND LOGISTICS SUPPORT (SELS) BASIC ORDERING AGREEMENT (BOA) M67854-26-G-0003. | $7.7M |
| 2026-05-14 | Department of the Air Force | United States | SATCOM SPACE VEHICLE | $149.6M |
| 2026-05-11 | National Aeronautics and Space Administration | United States | HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES | $11.4M |
| 2026-02-19 | Missile Defense Agency | United States | MISSILE DEFENSE AGENCY (MDA) MODELING AND SIMULATION VISTAS - THREAT AND ADVANCED SIMULATIONS DEVELOPMENT (MSV-TASD) EFFORTS. SEE SECTION J ATTACHMENT 1A MSV-TASD-PWS | $42.2M |
| 2026-01-28 | Defense Logistics Agency | United States | 8511739835!DOOR,AIRCRAFT | $265k |
| 2026-01-27 | Defense Logistics Agency | United States | 8511857131!TOOLING | $979k |
| 2026-01-27 | Defense Logistics Agency | United States | 8511884350!SEAL RING,INLET | $290k |
| 2026-01-06 | Defense Logistics Agency | United States | 8511843484!BOOT,DUST AND MOIST | $288k |
| 2025-09-24 | Missile Defense Agency | United States | THIS CONTRACT COVERS THE GROUND-BASED MIDCOURSE DEFENSE (GMD) WEAPON SYSTEM (GWS) SYSTEMS ENGINEERING, DESIGN, DEVELOPMENT, INTEGRATION, TESTING, AND FIELDING OF SOFTWARE AND HARDWARE. | $562M |
| 2024-12-31 | Department of the Army | United States | INTEGRATED BATTLE COMMAND SYSTEM (IBCS) HARDWARE FULL RATE PRODUCTION FOR WISLA PHASE II. | $480.8M |
| 2024-10-28 | Ministerie van Defensie | Netherlands | F35 Instruction Capacity | framework place |
| 2023-09-08 | Department of the Air Force | United States | STAND-IN ATTACK WEAPON (SIAW) PHASE 2 | $499.4M |
| 2022-07-29 | Missile Defense Agency | United States | GWS SOFTWARE DEVELOPMENT (GFC, IDT, GSS, | $560.4M |
| 2022-07-29 | Missile Defense Agency | United States | GWS DEVELOPMENT (PHASED ARRAY IDT ANTENN | $323.1M |
| 2022-06-21 | Department of the Navy | United States | FY22-FY26 PROGRAM SUPPORT (SCN/UK, CPFF, LOE) FY22-FY26 LAUNCHER PRODUCTION | $488M |
| 2021-12-23 | Department of the Army | United States | INTEGRATED BATTLE COMMAND SYSTEM (IBCS) HARDWARE LOW RATE INITIAL PRODUCTION/FULL RATE PRODUCTION (LRIP/FRP). | $869.2M |
| 2020-09-16 | Department of the Air Force | United States | EVOLVED STRATEGIC SATCOM SATELLITE PAYLOAD DEVELOPING HARDWARE AND SOFTWARE | $425.3M |
| 2020-09-08 | Department of the Air Force | United States | GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) | $14.4B |
| 2019-06-07 | Department of the Navy | United States | G/ATOR GAN FRP LOT 1 QTY 4 | $1.5B |
| 2019-03-13 | Department of the Army | United States | POLAND FMS THE INTEGRATED AIR AND MISSILE DEFENSE (IAMD) BATTLE COMMAND SYSTEM (IBCS). | $879.8M |
| 2019-03-13 | Department of the Navy | United States | UK09 DREADNOUGHT HARDWARE PRODUCTION | $448.9M |
| 2018-07-03 | Social Security Administration | United States | CONTRACTOR IS TO PROVIDE THE EXPERTISE, TECHNICAL KNOWLEDGE, IT SUPPORT PERSONNEL, AND OTHER RELATED RESOURCES NECESSARY FOR SYSTEMS ANALYSIS AND TESTING | $734.1M |
| 2018-06-25 | Department of the Air Force | United States | NEXT GENERATION OVERHEAD PERSISTENT INFRARED POLAR SPACE VEHICLES 1 AND 2 STUDY. | $3.5B |
| 2018-03-02 | Missile Defense Agency | United States | CONTRACT. THE PRIMARY PURPOSE OF THIS TASK ORDER IS TO IDENTIFY AND OPERATIONALIZE OVERHEAD PERSISTENT INFRARED (OPIR) AND OTHER SENSOR EXPLOITATION CAPABILITIES WHICH PROVIDE EARLY INTERCEPT OPPORTUNITIES AND INCREASE RAID HANDLING OF THE BALLISTIC MISSILE DEFENSE SYSTEM (BMDS). THE DEVELOPED CAPAB | $372.2M |
| 2018-02-06 | Defense Contract Management Agency | United States | ENHANCED POLAR SYSTEM RECAPITALIZATION - TWO PAYLOADS (P6&P7) | $472.1M |
| 2017-08-21 | Defense Contract Management Agency | United States | GROUND BASED STRATEGIC DETTERENT TECHNOLOGY MATURATION AND RISK REDUCTION | $366.5M |
| 2017-07-31 | Department of the Navy | United States | JCREW I1B1 MOUNTED / FIXED SYSTEMS | $746.3M |
| 2016-10-28 | Department of the Army | United States | HUNTER FY2017-2018 CONTRACTOR LOGISTICS SUPPORT | $422.2M |
| 2016-08-31 | Defense Contract Management Agency | United States | OTHER DIRECT COSTS AND TRAVEL PMC | $440.7M |
| 2016-01-14 | National Aeronautics and Space Administration | United States | ISS COMMERCIAL RESUPPLY SERVICES 2 | $3.7B |
| 2015-09-03 | National Aeronautics and Space Administration | United States | NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO T | $1.8B |
| 2015-03-23 | National Aeronautics and Space Administration | United States | JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION. | $575.3M |
| 2014-06-30 | Missile Defense Agency | United States | MDA INFORMATION TECHNOLOGY (IT) SERVICES PROVIDES DESIGN, IMPLEMENTATION AND MAINTENANCE SERVICES FOR MDAS CLASSIFIED AND UNCLASSIFIED WORKSTATIONS AND NETWORK INFRASTRUCTURE. IN ADDITION, IT SERVICES PROVIDES COMPUTER NETWORK DEFENSE, INFORMATION ASSURANCE, SERVICE DESK, PORTAL SERVICES AND BUSINES | $579.2M |
| 2012-10-30 | Defense Contract Management Agency | United States | CONTRACTOR LOGISTIC SUPPORT FOR HUNTER FY13 | $495.2M |
| 2011-09-13 | National Aeronautics and Space Administration | United States | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSI | $584.4M |
| 2008-09-23 | Department of the Army | United States | INTEGRATED AIR AND MISSILE DEFENSE (IAMD)BATTLE COMMAND SYSTEM (IBCS) BASIC AWARD FOR STEP I/PHASE-I PRELIMINARY DESIGN REVIEW (PDR) | $1.5B |
| 2007-12-06 | Department of the Army | United States | GCSS-ARMY (F/T) | $1.3B |
| 2007-03-30 | Defense Contract Management Agency | United States | GROUND/AIR TASK ORIENTED RADAR (G/ATOR) SYSTEM DEVELOPMENT | $877.3M |
| 2004-03-30 | Defense Contract Management Agency | United States | FA881904C0002 | $468.4M |
| 2002-09-16 | National Aeronautics and Space Administration | United States | THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSER | $4.3B |
| 2002-08-23 | Defense Contract Management Agency | United States | F0470102C0502 | $4.4B |
| 2002-04-18 | Defense Contract Management Agency | United States | 200208!000056!5700!CZ39 !SMC/PKZ LOS ANGELES AFB !F0470102C0009 !A!N! !N! !20020418!20100930!008324949!008324949!004179453!N!TRW INC !1 SPACE PARK BLVD !REDONDO BEACH !CA!90278!60018!037!06!REDONDO BEACH !LOS ANGELES !CALIFORNIA!+000010000000!N!N!000665000000!AC22!RDTE/MISSILE AND SPACE SYSTEMS-APPL | $1.9B |
| 1998-07-01 | Defense Contract Management Agency | United States | 200506!000026!5700!FA8214!OO-ALC/PKME/LMKE !F4261098C0001 !A!N! !Y! !P01502!20041213!20050701!001563738!004179453!016435559!N!NORTHROP GRUMMAN SPACE & MISSI!888 S 2000 E !CLEARFIELD !UT!84015!13850!011!49!CLEARFIELD !DAVIS !UTAH !-000001960000!N!N!000000000000!L014!TECH REP SVCS/GUIDED MISSILES !A2 | $10B |
| 1993-07-24 | Defense Contract Management Agency | United States | 199711!5700!0053!GZ39 !SMC/PKZ DEFENSE SUPPORT SYS DIR !F0470193C0001 !A!*!P00038 !19970724!20011231!197859408!197859408!004179453!N!11982!TRW INC !1 SPACE PARK BLVD !REDONDO BEACH !CA!90278!60018!037!06!REDONDO BEACH !LOS ANGELES !CALIFORNIA!0001!+000001463598!N!N!000000000000!AC25!RDTE/MISSILE AND | $620.6M |
| Defense Contract Management Agency | United States | F0470186C0022 | $486.3M |