400 kV Aurora transmission line
TRANSMISSION400 kV Aurora transmission line Victor Energy contributed to the Aurora Line project for Svenska kraftnät, a strategic interconnection between Sweden and Finland.The project is a cornerstone of the green industrial transition in northern Swede
Read more
Report
400 kV line Söderåsen - Barsebäck
TRANSMISSIONRenewal of the 400 kV Line Söderåsen - Barsebäck Victor Energy team built 45 km of 400 kv line in 10 weeks. Scope of work included demolition of old powerline, lattice tower construction & conductor stringing. Renewal of a 400 kV transmission
Read more
Report
240 kV Central East Transfer Out
TRANSMISSION240 kV Central East Transfer Out Central East Transfer Out Project purpose is to reinforce and upgrade the transfer-out capability of the transmission system in central-east Alberta to the rest of Alberta's Interconnected Electric System. Cons
Read more
Report
138 kV Line GL7
TRANSMISSION138 kV line GL7 Phase1 The purpose of this project was to build a new transmission line between the Glaslyn switching station to new Structure 214 and salvage the existing infrastructure. Construction of 138 kV transmission line Saskatchewan C
Read more
Report
230 kV Line Blackwater Gold
TRANSMISSION230 kV line Blackwater Gold Victor Energy constructed 82 km of transmission line, including framing and setting 370 h-frame, three-pole, and dead-end wood pole structures. Construction of a 230 kV transmission line B.C. CanadaBlackwater Gold M
Read more
Report
400 kV line Storfinnforsen to Midskog
TRANSMISSION400 kV line Storfinnforsen to Midskog Svenska kraftnät is rebuilding the world's oldest 400 kV transmission line between Storfinnforsen and Midskog. This is because several wind power plants are to be built in the area around Sollefteå which r
Read more
Report
420 kV line Fjotland to Duge
TRANSMISSION420 kV line Fjotland to Duge Statnett (Norwegian transmission line operator) was in the process of building its next-generation main grid. An important step towards the next generation main grid was to increase the grid voltage from 300 to 420
Read more
Report
400/220/110 kV Mikułowa Substation
SUBSTATIONS400/220/110 kV Mikułowa Substation The expansion of the Mikułowa substation will increase the efficiency of the power grid in terms of cross-border exchange at the voltage level of 400 kV between the power systems of Poland and Germany and impr
Read more
Report
110/15 kV Towarowa Substation
SUBSTATIONS110/15 kV Towarowa Substation Construction of 110/15 kV Towarowa substation and reconstruction of 110/15 kV Poznań Główna substation to improve the power supply to the city of Poznań is an investment undertaking of Enea Operator Sp. z o.o. and
Read more
Report
110 kV line Moravice to Vrbovsko
TRANSMISSION110 kV line Moravice to Vrbovsko As a part of the 110 kV transmission line from Vinodol to Rakitje, HOPS was in the process of rebuilding the Moravice - Vrbovsko section which was built in the 1950's. As the section lifespan was nearing its en
Read more
Report
Show more news
Tech stack
Technologies named in job postings at Victor Energy over the last 12 months, by layer, with the share of postings for each.
Technologies in use
1
Postings analysed
8
Stack modernity
85/100
Languages
Java
Sign in to see how your skills match this stack
Sign In
Growth
Hiring Momentum
33/100
Slowing
Open positions
5
0 opened / 3 closed in 30 days
Median time-to-fill
49 days
faster than 30% of the market
ATS activity
Every ~3 hours
Today
Hiring Dynamics
0%
Hiring Focus
The percentage next to each role is its share of the company's job openings over the last 90 days; the arrow shows the shift versus the previous period.
Administrative
56% ▼
Management
22% ▲
Operations
11% ▲
Field & Service
11% ▼
Activity Timeline
New location: Cornelius
Sep 2026
Added Microsoft Office to stack
Sep 2026
Offices
Where the company hires and what each office is for
Cities
2
Hiring now
2
Countries
1
Busiest office
Winnipeg
Loading the map
Headquarters
Builds here
Office with open vacancies
Tap a pin for the office
Winnipeg
Canada
2 open roles 3 posted in 90 days 50% remote 50-200 est. staff
hires for Administrative, Management
Edmonton
Canada
1 open roles 1 posted in 90 days 10-50 est. staff
hires for Operations
Earlier presence
Cornelius, United States