Construction of Bharatpur Brihat Water Supply Project, Bharatpur, Chitwan
Who can bidMostly local or locally registered suppliers: check foreign participation on the portal
- Deadline
- Nov 26 2026
- 3 d left
- Published
- Nov 5 2026
- Category
- Works
- CPV 45000000-7
- Procedure
- Open procedure
Description
Construction of Bharatpur Brihat Water Supply Project, Bharatpur, Chitwan Location: Bharatpur Metropolitancity, Chitwan Fiscal year: 2083/084 Contract: Unit Rate Contract Bill of quantities: Insurances for the loss of damage to works, plant, material, equipment, property and personal injury or death and as stipulated in Contract Data. Cost for complying with any other requirement (Study or Construction) not covered in BOQ, Automation Works, Smart Billing Systems, Third party inspection, General or Special Conditions of contract which may have a financial implication and necessary to complete the work as instructed and approved by the Engineer. Provide safety equipment for the Engineer at each of the site offices of the types and number specified for the period of the Contract as per Specification and instruction of the engineer. Provide and maintain cube testing facilities including molds for the duration of the contract and preparation and testing of cubes, marking, curing, storing and transport to lab for tests and maintain full records (Equipment and molds to remain in the contractor's property), Paid as number of cubes for all complete work as per direction of Engineer Daysworks Manpower: Provide the skilled labor (Mason, Carpenter, Concreter, Bar bender, Rock Chiselerer, Plumber etc.) as per request of client and verification by engineer. Daysworks Manpower: Provide the unskilled manpower as per the request of client and verification by engineer. Dayswork: Provide Back-hoe loader (Upto 150 HP) plants and equipment as per the demand of client and verification by Engineer including administration, supervision, operators allowance, fuel and other consumables, stores overhauls, repairs and placements and all other charges retaining to the plant and equipment including haulage all complete as per verification and instruction of engineer. Removal of top soil and stacking at the location as specified by the Engineer all complete work in all respects as per the approved drawings, technical specifications, and as directed by the Engineer. Earthwork in excavation for all types of soil by Combination both men and Machine for pipeline/Structural work/foundation trenches from ground level to underside of the pipeline/ Structural with approved material all complete work in all respects as per the approved drawings, technical specifications, and as directed by the Engineer. Earthwork in backfilling with all types of soil, compaction with ramming and site clearance for foundation and other trenches all complete work in all respects as per the approved drawings, technical specifications, and as directed by the Engineer. Filling sand brought from outside in 150mm layers under floors foundation etc. including watering, ramming, dressing, etc. all complete work in all respects as per the approved drawings, technical specifications, and as directed by the Engineer. Dry boulder packing in the all site all complete work in all respects as per the approved drawings, technical specifications, and as directed by the Engineer. Flat brick soling in foundation and floors with First class bricks in true line & level including watering and ramming all complete work in all respects as per the approved drawings, technical specifications, and as directed by the Engineer. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters - Cement Concrete Grade M-15 & M-20 including other fitting accessories all complete work in all respects as per the approved drawings, technical specifications, and as directed by the Engineer. Dismantling of Blacktopped Pavement Works in road crossing including disposal of material from the construction area all complete work in all respects as per
Parties
- WWater Supply and Sewerage Management Office, ChitwanBuyer
Source: Nepal Bolpatra e-GP · licence: not stated · https://bolpatra.gov.np
