Construction of Dumkibas Water Supply Project, Binayi Tribeni Rural Municipality 1, 2, Nawalpur
Who can bidMostly local or locally registered suppliers: check foreign participation on the portal
- Deadline
- Nov 26 2026
- 3 d left
- Published
- Nov 5 2026
- Category
- Works
- CPV 45000000-7
- Procedure
- Open procedure
Description
Construction of Dumkibas Water Supply Project, Binayi Tribeni Rural Municipality 1, 2, Nawalpur Location: Binayi Tribeni Rural Municipality 1, 2, Nawalpur Fiscal year: 2083/084 Contract: Unit Rate Contract Bill of quantities: Insurances for the loss of damage and personal injury or death and as stipulated in contract Data Geophysical survey (ERT/VES) for site selection of new DTWs incl. report, extent as per site Item not covered by BOQ Provide safety equipment for the Engineer at each of the site offices of the types and number specified for the period of the Contract as per Specification. Provide and maintain cube testing facilities including moulds for the duration of the contract and preparation and testing of cubes, marking, curing, storing and transport to lab for tests and maintain full records (Equipment and moulds to remain in the contractor's property), Paid as number of cubes for all complete work as per direction of Engineer (minimum number 200) Layout & setting out including site clearance of grass, shrubs, excavation of loose/soft soil to maximum depth of 150-200mm. Including dressing, levelling and disposal the excavated materials within the premises, complete all works as per design, drawing and all other relevant specifications, and as directed by the Engineer. Earthwork for excavation for all types of soil by Combination both men and Machine for pipeline/Structural work/Foundation Trenches/other trences from ground level to underside of the pipeline/Structural and disposal of surplus materials to the specified site imcluding 30m lead and 15.m lift as directed by the Engineer all complete as per specification and instructions of engineer.. Earth filling work with all types of soil in 15cm thick layer by layerwithout watering sprinkling for compaction with ramming and site clearance for foundation and other trenches all complete as per Drawing, specification and as directed by the Engineer. Filling with sand brought from outside in 150mm layers under floors foundation, etc. including watering, ramming, dressing, etc., complete all works as per design, drawing and all other relevant specifications, and as directed by the Engineer. Supply, packing and Filling with boulder stones complete all works as per design, drawing with all other relevant specifications, and as directed by the Engineer. Filling with gravel and boulder mixed soil stacked at site with 200 mm thick layers with well compaction, water sprinkling, etc. all complete in pipe trench. Supply and filling filter media :Sand (Effective size 0.2-0.3 mm & Cu
Parties
- WWater Supply and Sewerage Management Office, ChitwanBuyer
Source: Nepal Bolpatra e-GP · licence: not stated · https://bolpatra.gov.np