Gazprom Set AGZS tech stack

Gazprom Set AGZS builds mostly with 1C, Bash, PHP, PowerShell. Its stack also includes Linux, Windows, MS SQL. 1C is named in 15 of the 16 job postings Gazprom Set AGZS published in the last 12 months (94%). Counted by Alion from the job postings of Gazprom Set AGZS, updated Oct 9, 2026.

Source: Alion Coverage: the company's job postings of the last 12 months Oct 9, 2026
Technologies in use
20
Postings analysed
16
Open now
16
Modernity
61 /100

What programming languages does Gazprom Set AGZS use?

1C is named in 94% of job postings at Gazprom Set AGZS, followed by Bash (6%), PHP (6%), PowerShell (6%).

1C 15 94% required in 100% · 15 open now · since Sep 2026
Bash 1 6% required in 100% · 1 open now · since Sep 2026
PHP 1 6% required in 100% · 1 open now · since Sep 2026
PowerShell 1 6% required in 100% · 1 open now · since Sep 2026

What databases does Gazprom Set AGZS use?

MS SQL is named in 6% of job postings at Gazprom Set AGZS.

MS SQL 1 6% required in 100% · 1 open now · since Sep 2026

What cloud and platforms does Gazprom Set AGZS use?

Linux is named in 13% of job postings at Gazprom Set AGZS, followed by Windows (13%), Astra Linux (6%), Debian (6%).

Linux 2 13% required in 100% · 2 open now · since Sep 2026
Windows 2 13% required in 100% · 2 open now · since Sep 2026
Astra Linux 1 6% required in 100% · 1 open now · since Sep 2026
Debian 1 6% required in 100% · 1 open now · since Sep 2026
Grafana 1 6% required in 100% · 1 open now · since Sep 2026
RED OS 1 6% required in 100% · 1 open now · since Sep 2026
Ubuntu 1 6% required in 100% · 1 open now · since Sep 2026
VMWare 1 6% required in 100% · 1 open now · since Sep 2026
Show all (9)
Windows Server1

What developer tools does Gazprom Set AGZS use?

Ansible is named in 6% of job postings at Gazprom Set AGZS, followed by Prometheus (6%), Proxmox VE (6%), Zabbix (6%).

Ansible 1 6% required in 100% · 1 open now · since Sep 2026
Prometheus 1 6% required in 100% · 1 open now · since Sep 2026
Proxmox VE 1 6% required in 100% · 1 open now · since Sep 2026
Zabbix 1 6% required in 100% · 1 open now · since Sep 2026

Which engineering practices does Gazprom Set AGZS ask for?

DHCP is named in 6% of job postings at Gazprom Set AGZS, followed by DNS (6%).

DHCP 1 6% required in 100% · 1 open now · since Sep 2026
DNS 1 6% required in 100% · 1 open now · since Sep 2026

How does your stack fit Gazprom Set AGZS?

Sign in to compare your skills with this stack and see which open roles fit you.
Sign In

How modern is the Gazprom Set AGZS stack?

Modern 61/100

Gazprom Set AGZS scores 61 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How common is the Gazprom Set AGZS stack in its industry?

Share of the 900 companies in the same industries, whose stack Alion knows, that use each technology.

1C6%
Linux19%
Windows22%
Astra Linux0%
Bash5%
Debian1%
Grafana8%
MS SQL6%
PHP7%
PowerShell12%

Questions about the Gazprom Set AGZS tech stack

What programming languages does Gazprom Set AGZS use?

The languages named in Gazprom Set AGZS job postings are 1C (94%), Bash (6%), PHP (6%), PowerShell (6%), as a share of the 16 postings of the last 12 months.

Does Gazprom Set AGZS use Linux?

Yes. Linux is named in 2 of 16 job postings (13%) and required in 2 of them.

What cloud and platforms does Gazprom Set AGZS use?

The cloud and platforms named in Gazprom Set AGZS job postings are Linux (2), Windows (2), Astra Linux (1) (postings in brackets).

Is the Gazprom Set AGZS tech stack changing?

No new technology has appeared in Gazprom Set AGZS job postings in the last six months.

How modern is the Gazprom Set AGZS tech stack?

Gazprom Set AGZS scores 61 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How does Alion know the Gazprom Set AGZS tech stack?

Alion reads every job posting Gazprom Set AGZS publishes and tags the technologies each one names. The figures on this page count the 16 postings of the last 12 months and were updated on Oct 9, 2026.

Method and citation

Alion reads every job posting the company publishes and tags the technologies each one names. Shares count the postings of the last 12 months, open and closed; the company's own products are counted apart. How we count

Alion, "Gazprom Set AGZS tech stack: 20 technologies from 16 job postings", as of Oct 9, 2026. https://alion.io/company/agzsgazprom/technologies

Licence: CC BY-SA 4.0JSON