Swinerton
Construction

Swinerton tech stack

Swinerton builds mostly with SQL. Its stack also includes Azure, Databricks, Snowflake, Google BigQuery. Azure is named in 4 of the 32 job postings Swinerton published in the last 12 months (13%). Counted by Alion from the job postings of Swinerton, updated Nov 20, 2026.

Source: Alion Coverage: the company's job postings of the last 12 months Nov 20, 2026
Technologies in use
35
Postings analysed
32
Open now
21
Modernity
69 /100
New in 6 months
8

What programming languages does Swinerton use?

SQL is named in 6% of job postings at Swinerton.

SQL 2 6% optional · 2 open now · since Nov 2026

What frameworks and libraries does Swinerton use?

Unreal Engine is named in 6% of job postings at Swinerton, followed by AutoGen (3%), LangChain (3%).

Unreal Engine 2 6% optional · 1 open now · since Jul 2026
AutoGen 1 3% required in 100% · 1 open now · since Oct 2026
LangChain 1 3% required in 100% · 1 open now · since Oct 2026

What databases does Swinerton use?

Snowflake is named in 9% of job postings at Swinerton, followed by Google BigQuery (6%).

Snowflake 3 9% required in 33% · 3 open now · since Oct 2026
Google BigQuery 2 6% optional · 2 open now · since Nov 2026

What cloud and platforms does Swinerton use?

Azure is named in 13% of job postings at Swinerton, followed by Databricks (9%), AWS (6%), Framer (6%).

Azure 4 13% required in 50% · 3 open now · since Sep 2026
Databricks 3 9% required in 33% · 3 open now · since Oct 2026
AWS 2 6% required in 100% · since Sep 2026
Framer 2 6% required in 100% · 1 open now · since Jun 2026
Windows 2 6% required in 100% · 1 open now · since Sep 2026
Figma 2 6% optional · 1 open now · since Jul 2026
Active Directory 1 3% required in 100% · since Sep 2026
Microsoft Entra ID 1 3% required in 100% · since Sep 2026
Show all (11)
Looker1
Power BI1
Tableau1

What developer tools does Swinerton use?

AutoCAD is named in 25% of job postings at Swinerton, followed by Microsoft Excel (16%), Adobe InDesign (13%), 3ds Max (6%).

AutoCAD 8 25% required in 100% · 6 open now · since Apr 2026
Microsoft Excel 5 16% required in 100% · 2 open now · since Apr 2026
Adobe InDesign 4 13% required in 25% · 1 open now · since Sep 2026
3ds Max 2 6% optional · 1 open now · since Jul 2026
Semantic Kernel 1 3% required in 100% · 1 open now · since Oct 2026
Terraform 1 3% required in 100% · since Sep 2026

Which engineering practices does Swinerton ask for?

GMP is named in 22% of job postings at Swinerton, followed by CI/CD (6%), DNS (3%), Feature Store (3%).

GMP 7 22% required in 100% · 7 open now · since Aug 2026
CI/CD 2 6% required in 100% · 1 open now · since Sep 2026
DNS 1 3% required in 100% · since Sep 2026
Feature Store 1 3% required in 100% · 1 open now · since Oct 2026
FinOps 1 3% required in 100% · since Sep 2026
IAM 1 3% required in 100% · since Sep 2026
Master Data Management 1 3% required in 100% · 1 open now · since Nov 2026
OCR 1 3% required in 100% · 1 open now · since Nov 2026
Show all (12)
Platform Engineering1
SOAP1
Knowledge Graph1
Machine Learning1

How does your stack fit Swinerton?

Sign in to compare your skills with this stack and see which open roles fit you.
Sign In

How is the Swinerton stack changing?

Read from the dates of the postings themselves: a technology is new when the first posting that names it appeared in the last six months, rising or falling when its share of postings moved between the last two quarters.

First appeared
Google BigQueryNov 2026
SQLNov 2026
DatabricksOct 2026
SnowflakeOct 2026
AzureSep 2026
AWSSep 2026
CI/CDSep 2026
WindowsSep 2026

How modern is the Swinerton stack?

Modern 69/100

Swinerton scores 69 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How common is the Swinerton stack in its industry?

Share of the 3,157 companies in the same industries, whose stack Alion knows, that use each technology.

Azure8%
Databricks2%
Snowflake1%
AWS6%
Figma3%
Framer0%
Google BigQuery1%
SQL12%
Unreal Engine0%
Windows13%

What sets Swinerton apart

Databricks2%
Snowflake1%

Questions about the Swinerton tech stack

What programming languages does Swinerton use?

The languages named in Swinerton job postings are SQL (6%), as a share of the 32 postings of the last 12 months.

Does Swinerton use Azure?

Yes. Azure is named in 4 of 32 job postings (13%) and required in 2 of them.

What cloud and platforms does Swinerton use?

The cloud and platforms named in Swinerton job postings are Azure (4), Databricks (3), AWS (2) (postings in brackets).

Is the Swinerton tech stack changing?

Yes. Google BigQuery, SQL, Databricks, Snowflake first appeared in Swinerton job postings in the last six months.

How modern is the Swinerton tech stack?

Swinerton scores 69 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How does Alion know the Swinerton tech stack?

Alion reads every job posting Swinerton publishes and tags the technologies each one names. The figures on this page count the 32 postings of the last 12 months and were updated on Nov 20, 2026.

Method and citation

Alion reads every job posting the company publishes and tags the technologies each one names. Shares count the postings of the last 12 months, open and closed; the company's own products are counted apart. How we count

Alion, "Swinerton tech stack: 35 technologies from 32 job postings", as of Nov 20, 2026. https://alion.io/company/swinerton/technologies

Licence: CC BY-SA 4.0JSON