AltaLink
Energy & Utilities · Power Grid

AltaLink tech stack

AltaLink works mostly with Power BI, Active Directory, Linux, Unix. Its stack also includes Power BI, Active Directory. Power BI is named in 2 of the 9 job postings AltaLink published in the last 12 months (22%). Counted by Alion from the job postings of AltaLink, updated Nov 17, 2026.

Source: Alion Coverage: the company's job postings of the last 12 months Nov 17, 2026
Technologies in use
10
Postings analysed
9
Open now
5
Modernity
66 /100

What cloud and platforms does AltaLink use?

Power BI is named in 22% of job postings at AltaLink, followed by Active Directory (11%), Linux (11%), Unix (11%).

Power BI 2 22% required in 100% · 1 open now · since Oct 2026
Active Directory 1 11% required in 100% · since Sep 2026
Linux 1 11% required in 100% · 1 open now · since Nov 2026
Unix 1 11% required in 100% · 1 open now · since Nov 2026

What developer tools does AltaLink use?

AutoCAD is named in 11% of job postings at AltaLink, followed by DNP3 (11%), PSCAD (11%), PSS/E (11%).

AutoCAD 1 11% required in 100% · since Aug 2026
DNP3 1 11% required in 100% · 1 open now · since Nov 2026
PSCAD 1 11% required in 100% · 1 open now · since Sep 2026
PSS/E 1 11% required in 100% · 1 open now · since Sep 2026

Which engineering practices does AltaLink ask for?

MPLS is named in 33% of job postings at AltaLink, followed by NERC CIP (22%).

MPLS 3 33% required in 100% · 1 open now · since Sep 2026
NERC CIP 2 22% required in 100% · 2 open now · since Oct 2026

How does your stack fit AltaLink?

Sign in to compare your skills with this stack and see which open roles fit you.
Sign In

How modern is the AltaLink stack?

Modern 66/100

AltaLink scores 66 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How common is the AltaLink stack in its industry?

Share of the 949 companies in the same industries, whose stack Alion knows, that use each technology.

Power BI31%
Active Directory14%
Linux23%
Unix5%

Questions about the AltaLink tech stack

Does AltaLink use Power BI?

Yes. Power BI is named in 2 of 9 job postings (22%) and required in 2 of them.

What cloud and platforms does AltaLink use?

The cloud and platforms named in AltaLink job postings are Power BI (2), Active Directory (1), Linux (1) (postings in brackets).

Is the AltaLink tech stack changing?

No new technology has appeared in AltaLink job postings in the last six months.

How modern is the AltaLink tech stack?

AltaLink scores 66 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How does Alion know the AltaLink tech stack?

Alion reads every job posting AltaLink publishes and tags the technologies each one names. The figures on this page count the 9 postings of the last 12 months and were updated on Nov 17, 2026.

Method and citation

Alion reads every job posting the company publishes and tags the technologies each one names. Shares count the postings of the last 12 months, open and closed; the company's own products are counted apart. How we count

Alion, "AltaLink tech stack: 10 technologies from 9 job postings", as of Nov 17, 2026. https://alion.io/company/altalink/technologies

Licence: CC BY-SA 4.0JSON