Chelyabinsk Electrometallurgical Plant tech stack

Chelyabinsk Electrometallurgical Plant builds mostly with 1C. Its stack also includes SIEM, MS SQL, PostgreSQL. 1C is named in 2 of the 9 job postings Chelyabinsk Electrometallurgical Plant published in the last 12 months (22%). Counted by Alion from the job postings of Chelyabinsk Electrometallurgical Plant, updated Oct 12, 2026.

Source: Alion Coverage: the company's job postings of the last 12 months Oct 12, 2026
Technologies in use
10
Postings analysed
9
Open now
2
Modernity
64 /100

What programming languages does Chelyabinsk Electrometallurgical Plant use?

1C is named in 22% of job postings at Chelyabinsk Electrometallurgical Plant.

1C 2 22% required in 100% · since Aug 2026

What databases does Chelyabinsk Electrometallurgical Plant use?

MS SQL is named in 11% of job postings at Chelyabinsk Electrometallurgical Plant, followed by PostgreSQL (11%).

MS SQL 1 11% optional · 1 open now · since Oct 2026
PostgreSQL 1 11% optional · 1 open now · since Oct 2026

What cloud and platforms does Chelyabinsk Electrometallurgical Plant use?

SIEM is named in 22% of job postings at Chelyabinsk Electrometallurgical Plant.

SIEM 2 22% required in 100% · since Sep 2026

What developer tools does Chelyabinsk Electrometallurgical Plant use?

Zabbix is named in 33% of job postings at Chelyabinsk Electrometallurgical Plant.

Zabbix 3 33% required in 100% · 1 open now · since Sep 2026

Which engineering practices does Chelyabinsk Electrometallurgical Plant ask for?

DHCP is named in 33% of job postings at Chelyabinsk Electrometallurgical Plant, followed by DNS (33%), TCP/IP (33%), VLAN (33%).

DHCP 3 33% required in 100% · 1 open now · since Sep 2026
DNS 3 33% required in 100% · 1 open now · since Sep 2026
TCP/IP 3 33% required in 100% · 1 open now · since Sep 2026
VLAN 3 33% required in 100% · 1 open now · since Sep 2026
LAN 1 11% required in 100% · since Sep 2026

How does your stack fit Chelyabinsk Electrometallurgical Plant?

Sign in to compare your skills with this stack and see which open roles fit you.
Sign In

How modern is the Chelyabinsk Electrometallurgical Plant stack?

Modern 64/100

Chelyabinsk Electrometallurgical Plant scores 64 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How common is the Chelyabinsk Electrometallurgical Plant stack in its industry?

Share of the 134 companies in the same industries, whose stack Alion knows, that use each technology.

1C28%
SIEM4%
MS SQL13%
PostgreSQL17%

Questions about the Chelyabinsk Electrometallurgical Plant tech stack

What programming languages does Chelyabinsk Electrometallurgical Plant use?

The languages named in Chelyabinsk Electrometallurgical Plant job postings are 1C (22%), as a share of the 9 postings of the last 12 months.

Does Chelyabinsk Electrometallurgical Plant use SIEM?

Yes. SIEM is named in 2 of 9 job postings (22%) and required in 2 of them.

What cloud and platforms does Chelyabinsk Electrometallurgical Plant use?

The cloud and platforms named in Chelyabinsk Electrometallurgical Plant job postings are SIEM (2) (postings in brackets).

Is the Chelyabinsk Electrometallurgical Plant tech stack changing?

No new technology has appeared in Chelyabinsk Electrometallurgical Plant job postings in the last six months.

How modern is the Chelyabinsk Electrometallurgical Plant tech stack?

Chelyabinsk Electrometallurgical Plant scores 64 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.

How does Alion know the Chelyabinsk Electrometallurgical Plant tech stack?

Alion reads every job posting Chelyabinsk Electrometallurgical Plant publishes and tags the technologies each one names. The figures on this page count the 9 postings of the last 12 months and were updated on Oct 12, 2026.

Method and citation

Alion reads every job posting the company publishes and tags the technologies each one names. Shares count the postings of the last 12 months, open and closed; the company's own products are counted apart. How we count

Alion, "Chelyabinsk Electrometallurgical Plant tech stack: 10 technologies from 9 job postings", as of Oct 12, 2026. https://alion.io/company/chemk/technologies

Licence: CC BY-SA 4.0JSON