UTGC tech stack
UTGC builds mostly with 1C, SQL. Its stack also includes Power BI, VMWare, MS SQL, MySQL. 1C is named in 5 of the 9 job postings UTGC published in the last 12 months (56%). Counted by Alion from the job postings of UTGC, updated Nov 15, 2026.
What programming languages does UTGC use?
1C is named in 56% of job postings at UTGC, followed by SQL (11%).
What databases does UTGC use?
MS SQL is named in 11% of job postings at UTGC, followed by MySQL (11%), PostgreSQL (11%).
What cloud and platforms does UTGC use?
Power BI is named in 22% of job postings at UTGC, followed by VMWare (22%), Windows (22%), Windows Server (22%).
What developer tools does UTGC use?
Hyper-V is named in 22% of job postings at UTGC, followed by Microsoft Excel (22%), КриптоПро (22%), Zabbix (11%).
Which engineering practices does UTGC ask for?
TCP/IP is named in 22% of job postings at UTGC, followed by VLAN (22%), DHCP (11%), DNS (11%).
What does each UTGC team work with?
The technologies each team's postings require most often, with the number of postings that require them.
DevOps
3 postingsHow does your stack fit UTGC?
How modern is the UTGC stack?
UTGC scores 68 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.
How common is the UTGC stack in its industry?
Share of the 92 companies in the same industries, whose stack Alion knows, that use each technology.
Companies with a stack like UTGC
Questions about the UTGC tech stack
What programming languages does UTGC use?
The languages named in UTGC job postings are 1C (56%), SQL (11%), as a share of the 9 postings of the last 12 months.
Does UTGC use Power BI?
Yes. Power BI is named in 2 of 9 job postings (22%) and required in 2 of them.
What cloud and platforms does UTGC use?
The cloud and platforms named in UTGC job postings are Power BI (2), VMWare (2), Windows (2) (postings in brackets).
What skills do you need for a DevOps job at UTGC?
DevOps postings at UTGC most often require Hyper-V (2), VMWare (2), Windows (2), Windows Server (2), out of 3 postings in the last 12 months.
Is the UTGC tech stack changing?
No new technology has appeared in UTGC job postings in the last six months.
How modern is the UTGC tech stack?
UTGC scores 68 out of 100 (Modern). The score averages how current each technology in the stack is and adds weight for AI adoption. AI technologies in the stack: 0; legacy ones: 0.
How does Alion know the UTGC tech stack?
Alion reads every job posting UTGC publishes and tags the technologies each one names. The figures on this page count the 9 postings of the last 12 months and were updated on Nov 15, 2026.
Method and citation
Alion reads every job posting the company publishes and tags the technologies each one names. Shares count the postings of the last 12 months, open and closed; the company's own products are counted apart. How we count
Alion, "UTGC tech stack: 20 technologies from 9 job postings", as of Nov 15, 2026. https://alion.io/company/giftsait/technologies
